Olympic cost over-runs infographic
- Status: Closed
- Hadiah: $75
- Penyertaan Diterima: 8
- Pemenang: richardwct
Ringkasan Peraduan
I need an infographic about the potential 2026 Calgary Olympic winter games bid. I'd like to use some stylized cartoon-ish graphics of Calgary, Canada landmarks in the background and/or olympic sport cartoon-ish graphics and then show the cost overruns from the last 10 winter olympics as detailed on table 3 in this report: http://eureka.sbs.ox.ac.uk/6195/1/2016-20.pdf
Maybe a bar chart or some other visualization of the cost overruns.
And maybe stick Calgary in there with a question mark next to it.
Size of the graphic should be 5" x 6.7" and high dpi suitable for print.
Kemahiran Disyorkan
Maklum Balas Majikan
“Really nice work and fixed issues quickly. ”
TaxpayerDOTcom, Canada.
Penyertaan teratas dari peraduan ini
-
richardwct Malaysia
-
richardwct Malaysia
-
mishrapeekay India
-
mishrapeekay India
Papan Penjelasan Umum
Bagaimana untuk mulakan dengan peraduan
-
Siarkan Peraduan Anda Cepat dan mudah
-
Dapatkan Bertan-tan Penyertaan Dari serata dunia
-
Anugerahkan penyertaan terbaik Muat turun fail - Mudah!