Tapis

Carian terbaru saya
Tapis melalui:
Bajet
hingga
hingga
hingga
Jenis
Kemahiran
Bahasa
    Status Pekerjaan
    4 tugasan ditemui, harga dalam USD
    Quantity Surveying Assignment 6 days left
    DISAHKAN

    I need assistance with calculating quantity surveying material, plant and labor costs for cement, rods and vertical footings. Must be dead accurate on finding the item rates and final costs. Your payment is dependent on this. Regards

    $409 (Avg Bid)
    $409 Avg Bida
    11 bida

    Looking for someone to help build 3 to 4 small stages for people to dance on during parties (less than a foot of the ground)

    $30 - $250
    Tempatan
    $30 - $250
    0 bida

    I want to build a wall and I need a concreter

    $16 / hr (Avg Bid)
    Tempatan
    $16 / hr Avg Bida
    3 bida

    عبارة عن تجمع المهندسين والمقولوان في مكان واحد

    $140 (Avg Bid)
    Tempatan
    $140 Avg Bida
    15 bida