Google Spreadsheets Jobs

Tapis

Carian terbaru saya
Tapis mengikut:
Bajet
hingga
hingga
hingga
Jenis
Kemahiran
Bahasa
    Status Pekerjaan
    4 tugasan ditemui, harga dalam USD
    For Assembly Form 6 hari left
    DISAHKAN

    The scope of work: Create Form Assembly form prepopulated with prime contract information from Salesforce. The form is to be sent to prime contractors to enter subcontract data for their contracts. Each prime contractor can have more than one contract. Each prime contract can have more than one subcontract. Data entered by prime contractors will be saved in Google spreadsheet or downloaded manually from Form Assembly in csv file

    $393 (Avg Bid)
    $393 Avg Bida
    9 bida

    Why are these formulae not returning the same result when they should (multi-criteria met)? =if('3. Sorted by Density'!FP9=TRUE,ifna(index($A$4:$A8,MATCH($A9,FP$4:FP8,0),1),IFNA(index($A10:$A204,MATCH(true,'3. Sorted by Density'!FP10:FP205,0)),"ORPHAN"))) vs =if('3. Sorted by Density'!FP9=TRUE,ifna(index($A$4:$A8,MATCH(1,($A9=FP$4:FP8)*(FW:FW=FW9),0),1),IFNA(index($A10:$A204,MATCH(0,(true='3. Sorted by Density'!FP10:FP205)*(FW:FW=FW9),0)),"ORPHAN")))

    $25 / hr (Avg Bid)
    $25 / hr Avg Bida
    7 bida
    google sheet plugin developer 3 hari left
    DISAHKAN

    Need to develop a plugin to send customized sms and whats-app message from google sheet by using xml / http api.

    $197 (Avg Bid)
    $197 Avg Bida
    7 bida
    I need an Excel Expert 2 hari left
    DISAHKAN

    I have two lists: - a bill of material showing with the following columns: product code, drawing no., qty - a list of product with the following columns: product code, delivery date first lot, qty lot 1, delivery date lot 2, qty lot 2 I need to allocate the product of the second list to the drawings of the first list, showing the latest date of reception of material for each drawing .

    $843 (Avg Bid)
    $843 Avg Bida
    48 bida