
Dalam Kemajuan
Disiarkan
The base models for a seeded reactor/clarifier and two companion tanks are already built in SolidWorks 2025; I simply need the last engineering touches applied so I can release the package for fabrication. Your primary task is to drop an existing drive (motor + gearbox) that I will supply in .STEP format into the clarifier assembly, mate it where it makes mechanical sense, and secure it with the standard mounts already present in the model. Exact coordinates are not critical—as long as fit and function are respected, I’m happy. Once the drive is seated, finish off the few lingering details (fasteners, hole call-outs, tidy mates) and update the BOM and drawings so everything reflects the final state. Native SolidWorks 2025 files are essential; no back-saving. I’m on a tight timeline and plan to review as soon as you upload the updated SLDDRW, SLDPRT and SLDASM files. If you know your way around large assemblies and can turn this around quickly, let’s get started right away.
ID Projek: 40288200
16 cadangan
Projek jarak jauh
Aktif 1 bulan yang lalu
Tetapkan bajet dan garis masa anda
Dapatkan bayaran untuk kerja anda
Tuliskan cadangan anda
Ianya percuma untuk mendaftar dan membida pekerjaan