Planning road construction inside factory premises. Close to 2500 sq. mtr of concrete road and approx. 2000 sq. mtr of paver block road. Need a civil engineer for overlooking the work. Around 2 to 3 months of work.
ID Projek: 15700549

Tentang projek

5 cadangan
Projek jarak jauh
Aktif 6 tahun yang lalu

Ingin menjana wang?

Faedah membida di Freelancer

Tetapkan bajet dan garis masa anda
Dapatkan bayaran untuk kerja anda
Tuliskan cadangan anda
Ianya percuma untuk mendaftar dan membida pekerjaan
5 pekerja bebas membida secara purata ₹59,944 INR untuk pekerjaan ini
Avatar Pengguna
Hi, I am Vincent, a civil engineer by profession. I can help you with the assignment. Kindly allow me to discuss the project with you. Regards Relevant Skills and Experience Civil engineer Proposed Milestones ₹83333 INR - NEGOTIABLE
₹83,333 INR dalam 3 hari
5.0 (13 ulasan)
3.9
3.9
Avatar Pengguna
A proposal has not yet been provided
₹41,666 INR dalam 10 hari
0.0 (0 ulasan)
0.0
0.0
Avatar Pengguna
A proposal has not yet been provided
₹62,222 INR dalam 100 hari
0.0 (0 ulasan)
0.0
0.0
Avatar Pengguna
I was working with the Department of Public Works and Highways in our country as project engineer in various projects, roads, drainage, shore protection, school buildings, multi-purpose building, bridges..etc., my short construction methodology are as follows; 1. A survey should be conducted to be precise of the project limits and contours. 2. Layout will be conducted in preparation for the sub-base and base coarse aggregates, any downgrade area should be filled to attain the specifications of the design. 3. After all cuts and fills are accomplished, a sub-grade aggregates will be spread on the area to be cemented, in which a compaction will be conducted to attain a 95% to 100% compaction. 4. After the compaction of the sub-grade is attained, a base coarse aggregates will be spread, depending on the specified thickness, and compaction will be conducted to attain the 95% to 100% compaction. 5, A field density test will be conducted, to assure the base aggregates are fully compacted and are ready for concrete pouring, this will depend on the design of the concrete and thickness. 6. A mock-up will be conducted in the project area, and a concrete cylinder will be made for compression test on specified number of days. 7. If the concrete requires for a reinforcing bars, a design will be submitted with the bar sizes. But with the construction joints, it is required to install reinforcing bars to connect the concrete with maximum adhesiveness.
₹62,500 INR dalam 20 hari
0.0 (0 ulasan)
0.0
0.0

Tentang klien

Bendera INDIA
India
0.0
0
Ahli sejak Nov 22, 2017

Pengesahan Klien

Terima kasih! Kami telah menghantar pautan melalui e-mel kepada anda untuk menuntut kredit percuma anda.
Sesuatu telah berlaku semasa menghantar e-mel anda. Sila cuba lagi.
Pengguna Berdaftar Jumlah Pekerjaan Disiarkan
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Memuatkan pratonton
Kebenaran diberikan untuk Geolocation.
Sesi log masuk anda telah luput dan telah dilog keluar. Sila log masuk sekali lagi.