
Dalam Kemajuan
Disiarkan
Dibayar semasa penghantaran
You are required to complete a full, detailed take-off for a public domain civil/landscape project based on the provided drawings, specifications, and pricing schedule. This is not a basic quantity take-off. The expectation is that you approach this like a Tier 1 contractor, meaning you must fully understand how the project is constructed and measure accordingly. Scope of Work: Review all drawings thoroughly (civil, landscape, electrical, and details). Do not rely on any provided quantities — you must independently verify and measure everything. Complete a full take-off and populate the provided Excel pricing schedule. All quantities must be accurate, clearly measured, and traceable back to drawings. Break down all items by type and material. Do not group items broadly. For example, all paving must be separated into: granite paving sandstone paving permeable paving brick headers cobblestones Measure for construction, not just plan areas. This means including: bedding layers subgrade preparation edge restraints wastage and cuts excavation depths and volumes base layers Civil Works: Calculate excavation volumes based on levels (not assumed depths) Measure subgrade areas, slabs, kerbs, footings, and all concrete works Identify and measure retaining walls and edge details Drainage and Services: Measure all pipe lengths, pit quantities, trench drains, and water services Include fittings, connections, and allowances for trenching and backfill Hardscape: Measure all paving areas accurately from drawings Include stairs (treads, risers), tactiles, nosings, and transitions Identify detailed areas such as feature paving, stage areas, and interfaces Landscape: Measure planting areas, soil volumes, mulch, and all planting quantities Calculate stratavault/soil cell volumes based on plan extents and depths Include irrigation extents and components Furniture and Fixtures: Count all items individually (benches, bins, bollards, shelter, etc.) Ensure each item aligns with schedules and drawings Electrical: Count all fittings, poles, and fixtures Measure conduit routes and estimate cable runs where possible Identify Missing Scope: If anything is shown on drawings but not in the BOQ, flag it clearly Provide notes on any discrepancies or unclear items Provide a Take-Off Summary Sheet: Clearly explain assumptions Highlight provisional quantities Identify risks or uncertainties Important Requirements: Accuracy is critical — this will be used for tender pricing All quantities must be realistic and constructible Do not guess — if unclear, raise it Include comments/notes for every major item Deliverables: Fully populated Excel take-off sheet Marked-up drawings (if possible) Summary of assumptions and clarifications required The goal is to produce a complete, construction-based take-off that can be confidently priced and submitted without major gaps or risk.
ID Projek: 40351077
24 cadangan
Projek jarak jauh
Aktif 1 hari yang lalu
Tetapkan bajet dan garis masa anda
Dapatkan bayaran untuk kerja anda
Tuliskan cadangan anda
Ianya percuma untuk mendaftar dan membida pekerjaan
24 pekerja bebas membida secara purata $709 AUD untuk pekerjaan ini

As an experienced Civil Engineer with a career dedicated to ensuring accurate and reliable construction documentation, I am confident in my abilities to meet your project's requirements. Having built my proficiency in AutoCAD, Civil 3D, and Excel - the very tools you require for your Detailed Civil/Landscape Project Take-Off - during my tenure at NESPAK, a frontrunner in civil engineering consultancy in Pakistan, I am well-versed in producing thorough and meticulous analysis and cost estimates. My skill with software such as Primavera, MS Project, and SIDRA aligns perfectly with your expectations. One aspect that truly sets me apart is my keen attention to detail. I understand that this take-off must be approached comprehensively, ensuring detailed measurements traceable back to drawings by breaking down items not broadly, but by type and material as specified. Drawing on my long-standing experience measuring for construction rather than merely plan areas, I will meticulously calculate excavation volumes based on levels instead of assumed depths and account for every single component - from fittings to concessions – for all the different divisions on the project. Lastly, one of the things you mentioned was clarity of assumptions and risks. My communication skills honed both through producing technical reports and lecturing at an engineering university will allow me to communicate any unidentified discrepancies or unclear items effectively.
$500 AUD dalam 5 hari
6.1
6.1

Hello, I can assist with preparing a full construction-based take-off for your public domain civil/landscape project. I have extensive experience performing detailed quantity take-offs from civil, landscape, and services drawings, ensuring the measurements reflect actual construction requirements rather than simple plan quantities. For this project, I will: ✓ Thoroughly review all civil, landscape, electrical drawings, specifications, and pricing schedules ✓ Independently measure all quantities directly from drawings (no reliance on provided figures) ✓ Break down items by material type and construction layer such as paving types, bedding, subgrade, base layers, edge restraints, and excavation volumes ✓ Measure civil works, drainage/services, hardscape, landscape elements, furniture/fixtures, and electrical components in detail ✓ Ensure every quantity is traceable to drawing numbers and details ✓ Flag missing scope items, discrepancies, and risks that may affect tender pricing Deliverables will include: • Fully completed Excel take-off and pricing schedule • Marked-up drawings • Take-off summary sheet My approach follows Tier-1 contractor estimating standards, focusing on accuracy, constructability, and transparency so the quantities can be confidently used for tender submission. I would be happy to review the drawings and begin the take-off immediately. Best regards, Abdul Karim Quantity Surveyor | AutoCAD Specialist Civil & Landscape Take-offs | BOQ Preparation
$700 AUD dalam 5 hari
5.4
5.4

Hi there, I reviewed your job posting and see you’re looking for a full, construction-level take-off for a civil/landscape project with detailed breakdowns and pricing integration. I’ve completed similar Tier 1 standard take-offs for public domain and infrastructure projects across the USA, Canada, and Australia — delivering precise, fully traceable quantities aligned with drawings and specs. ✅ Independent quantity verification from civil, landscape & MEP drawings ✅ Detailed breakdown (paving types, layers, excavation, drainage, etc.) ✅ Construction-based measurements including subgrade, bedding, wastage & volumes ✅ Full population of Excel pricing schedule with clear traceability ✅ Identification of missing scope, risks & discrepancies Recently, I completed a similar landscape and civil take-off where every item — from paving types to drainage and planting — was measured with construction detail, allowing the contractor to submit a confident, risk-free bid. I’ve attached samples in my portfolio if you'd like to see the quality and detail of my estimates: https://www.freelancer.com/u/ranaabubakar1993 Can we do a quick chat to discuss your project scope and deadline? Best regards,
$500 AUD dalam 1 hari
3.9
3.9

I’ve successfully completed several high-stakes take-offs for public domain civil works, including recent streetscape developments where precision in material scheduling was critical for budget compliance. I understand that public sector projects require rigorous attention to detail to meet strict municipal specifications and complex site conditions. Having managed similar landscape-civil integrations, I am ready to analyze your drawings to ensure every cubic meter of sub-base and linear meter of edging is captured with zero margin for error. My approach utilizes Bluebeam Revu for precise digital measurements, ensuring civil grading, drainage, and hardscape finishes are layered for transparent cross-referencing. I will deliver a structured Excel BOQ categorized by your project codes, featuring detailed volume calculations for bulk earthworks and specific unit counts for all softscape elements. To ensure accuracy, I cross-verify architectural landscape plans against civil grading sheets to flag any discrepancies in levels or material transitions before they impact your tender. To align with your bidding strategy, do you require the take-off to be segregated by construction phases or mobilization zones? Also, are there specific municipal standard drawings we should cross-reference for the utility and paving details? I’m available to discuss these technical nuances or jump on a quick call to align on your preferred delivery format—I am ready to help you submit a winning, data-backed bid and ensure no material costs are left unaccounted for in your final proposal.
$712 AUD dalam 21 hari
2.6
2.6

With a wide range of technical expertise including Data Science, Machine Learning, Full-Stack Development and Cloud Architecture, I am no stranger to handling complex projects like detailed take-offs. My skills will enable me to approach this project with the precision and rigor of a Tier 1 contractor that you require. In terms of AutoCAD, my industrial systems experience is directly applicable to this project, specifically in SCADA and HMI applications. I'm familiar with this drawing system and able to work swiftly and effectively in it. Additionally, I have extensive experience in preparing highly accurate Excel spreadsheets. Lastly, my commitment to accuracy makes me the most suitable candidate for this demanding task. My experience as a Data Scientist has crystallized my awareness of how crucial accurate data is for informed decision making – a quality that will prove invaluable in ensuring your tender pricing is solid and your project can proceed with minimal rocks in the road. Just in case things get murky, I also leverage my communication skills to promptly seek clarification so that nothing falls through the cracks. Though my background doesn't lie primarily in Civil or Landscape projects but adapting isn't an alien concept to me. So trust me when I say that despite any initial unfamiliarity, I am fiercely dedicated to delivering excellent work that meets all your specifications.
$250 AUD dalam 7 hari
3.0
3.0

Hello, While my background is in software engineering and data analysis rather than direct civil construction, I can support the preparation of a detailed take-off by structuring the Excel pricing schedule, organizing quantities, and ensuring all assumptions and notes are clearly documented. My focus will be on accuracy, traceability, and clear reporting. I have strong experience in data processing, Excel automation, and technical documentation. Deliverables will include: • Fully populated Excel take-off sheet • Clear summary of assumptions and clarifications • Organized notes highlighting risks or missing scope Given the scope, I estimate 10–14 days for completion. My bid is $700 AUD, reflecting the effort required for a thorough and professional result. Looking forward to working on your project. Best regards, Somee
$700 AUD dalam 14 hari
1.5
1.5

I understand that you require a meticulous and comprehensive take-off for your civil/landscape project, ensuring every detail is accurately measured and traceable back to the provided drawings. Given my 12+ years of experience in construction estimation and project management, I can approach this task like a Tier 1 contractor, guaranteeing precision at every step. Utilizing advanced tools, I will thoroughly analyze all drawings—including civil, landscape, electrical elements—and ensure that every quantity is verified independently. My expertise in technology such as Excel for data management ensures seamless population of pricing schedules with clear breakdowns of materials and types. I am committed to identifying any discrepancies while providing a complete take-off summary that highlights assumptions and possible risks. Could you provide details on any specific software or methodologies you prefer for managing the project documentation?
$750 AUD dalam 7 hari
0.0
0.0

Hi, I’ll deliver a full construction-level take-off with accurate, traceable quantities ready for tender pricing. What you’ll get: * Fully populated Excel pricing schedule with detailed breakdowns * Measured quantities across civil, drainage, hardscape, landscape, electrical, and fixtures * Construction-based calculations (excavation, subgrades, bedding, wastage, layers) * Separate itemization by material/type (no broad grouping) * Pipe runs, pits, conduits, fittings, and service allowances * Planting, soil volumes, irrigation, and furniture counts * Marked-up drawings showing measurement references * Take-off summary with assumptions, risks, and missing scope flagged I approach take-offs like a Tier 1 contractor—verifiable, detailed, and buildable with no guesswork. Timeline: 5–7 days depending on drawing set Budget: $250 AUD Ready to start immediately!
$250 AUD dalam 5 hari
0.0
0.0

With my extensive experience in civil engineering, particularly in construction take-off, I am confident in delivering an accurate, detailed, and constructible project assessment that aligns perfectly with your specific needs. Having worked on numerous projects similar to yours for over 5 years, I understand the importance of a reliable take-off for tender pricing. My proficiency in AutoCAD ensures not just accurate measurements but also informed familiarity with electrical layouts and detailed landscape drawings that holds critical importance for this assignment. My unique approach as a Tier 1 contractor includes never settling for assumptions and striving for independent verification and measurement. Evident through my skills in Revit, Tekla, and SolidWorks, I use existing quantities only as references while conducting thorough reviews of all provided documentation to avoid any discrepancies or missed items. Moreover, my expertise in not just plan areas but construction aspects such as bedding layers, cuts, edge restraints, and excavation depths makes me an ideal candidate for the job. Finally, I understand that a successful take-off is characterized by exhaustive detailing as well as transparency. Therefore, alongside providing accurate quantities on your Excel pricing schedule clearly traceable to the drawings and separating all items by type and material in line with your expectations.
$500 AUD dalam 7 hari
0.0
0.0

Dear Client, I am a Civil Engineer & Quantity Surveyor with 15 years’ experience (9 years Dubai, 6 years India), currently providing freelance take-offs for villas, residential buildings, and partial scope for large-scale projects covering substructure, superstructure, masonry, finishes, and architectural works. I understand this requires a Tier 1–level, construction-based take-off. I will independently review all drawings and not rely on provided quantities. For this project, I will: • Perform full take-off using PlanSwift with marked-up drawings • Populate Excel with clear, traceable quantities • Break down items by material/specification (no grouping) • Measure based on construction methodology (levels-based excavation, sub-base, bedding, edge restraints, wastage) • Quantify drainage, hardscape, landscape & furniture • Identify missing scope and discrepancies • Provide summary with assumptions, provisional quantities & risks While my primary expertise is in civil and structural works, I can review and quantify basic external services (such as drainage and conduits) based on drawings. Deliverables: • Completed Excel take-off • Marked-up drawings • Summary & clarifications Timeframe: 15 working days Fee: $750 AUD I focus on accuracy and constructability to ensure a reliable tender submission.
$750 AUD dalam 15 hari
0.0
0.0

Sydney, Australia
Kaedah pembayaran disahkan
Ahli sejak Mei 8, 2025
$250-750 AUD
$250-750 AUD
$250-750 AUD
$250-750 AUD
$250-750 AUD
£750-1500 GBP
$8-15 CAD / jam
$10-30 USD
$2-8 USD / jam
₹750-1250 INR / jam
$1500-3000 USD
₹12500-37500 INR
$15-25 CAD / jam
₹1500-12500 INR
$30-250 USD
$2-8 USD / jam
$10-30 USD
£250-750 GBP
$50-150 AUD
$1500-3000 USD
$250-750 CAD
$30-250 USD
₹1500-12500 INR
£750-1500 GBP
$30-250 USD