wallap and rs2

Rock Anchor Details

Total length – 4 m, Diameter – 24 mm, Reinforcement direction – 150, Bond diameter – 0.13 m, Bond skin friction – 250 kPa, Bond resistance – 25.52 kN/m, Spacing - 2 m x 2 m, Bar capacity – 180 kN, Safety factor – 1.8, Grout Strength - 40 MPa

Construction Sequence

1. Excavate 2.5 m and install the 1st anchor at RL 172.0m

2. Excavate up to 4.5 m and install the 2nd anchor at RL 170.0m

3. Excavate up to the final level (RL159.5m) with 4 more equal lifts (2.5m high)

Loading and water table assumptions

• During the construction – Short term – Live load over the surface is 10 kPa

• Short term water table – 3.0m above SS-III

• At service stage – Long term live load over the surface is 25 kPa

• Long water table – (i) 1.0m below SS-III, (ii) 1.0m below SS-V

Questions 1:

Calculate Global Factor of Safety (FoS) for following cases using SLOPE/W

1. Stage 1 excavation

2. Stage 2 excavation

3. Calculate FoS for each excavation lift

4. Long term for final excavation, with fluctuation of water table (low and high)

5. Plot excavation depth vs FoS

Question 2:

Provide three reasons for difference in FoS at final excavation in short term and long term.

Kemahiran: Kejuruteraan Awam, Kejuruteraan Struktur, Construction Engineering, Kejuruteraan

Lihat lagi: wss contacts details web part, javascript total forms page, select countpproducts_id total products_description products mysql5, javascript show total, rock music posters samples, php script read folder file details, wwwphoto design musik rock, rock bands email, running sum total sql update, posted length fileupload javascript, autocad objectarx total length, import ftp details total commander, facebook graph api post details total comments, total braches details of freelancer, total details of a ecommerce website, how to calculate anchor bolt length, nivedita setu total length, yavuz sultan selim bridge total length, anchor rope length calculator, the maximum slope length for a 12” diameter filter log on a 3:1 slope is:

Tentang Majikan:
( 646 ulasan ) Bangalore, India

ID Projek: #31508951

4 pekerja bebas membida secara purata ₹2313 untuk pekerjaan ini

EslamWafdy

Hi,Dear I have read and checked your attachments. I can help you. Looking forward to working with you. Best Regards Eslam

₹2000 INR dalam 2 hari
(10 Ulasan)
3.7
yadavnit123

I am geotechnical deign engineer, I working on ground improvement, slope stabilization and rock strengthening using numerical analysis reference of geotechnical investigation, site investigation report and geo environm Lagi

₹2500 INR dalam 2 hari
(1 Ulasan)
3.0
akashfpatil

Hello, Can help you out in wallap analysis and in the overall techincal analysis/inference. Thank you.

₹2500 INR dalam 5 hari
(0 Ulasan)
0.0
shubhams9486

As i have done my internship in site execution and have completed by bechlor's degree and awaiting for the result of all india entrance for mtech and have very good conceptual knowledge and as i supposed to be get dece Lagi

₹2250 INR dalam 7 hari
(0 Ulasan)
0.0