
Closed
Posted
Paid on delivery
I need a suitably qualified Australian hydraulic engineer provide a report into appropriate rectification to address a tiled balcony that was built without adequate falls and now suffers from constant ponding. Report must clearly explain why the existing surface, drainage and waterproofing are failing. Including calculation site specific based evidence as to why falls are imperative to prevent water ingress. Lay out practical, code-compliant solutions. The final document should: • Summarise observations, measurements and photographs taken on site. - Provide and drawing on how the correct falls need to implimented. • Reference the NCC and relevant Australian Standards (e.g. AS 4654.2, AS 3500) for compliance gaps • Recommend specific rectification steps such as minimum fall gradients, added or relocated drains, membrane replacement details and any ancillary carpentry or structural adjustments required • Include sketches or marked-up plans highlighting proposed works • Be signed and stamped to satisfy insurers and contractors who will price and carry out the repairs Timing is flexible but sooner is better so I can move ahead with builders. If you are registered in Australia and experienced in balcony drainage and waterproofing assessments, I look forward to your proposal and a quick site visit. Full construction plans are available for viewing.
Project ID: 40783892
2 proposals
Active 7 days ago
Location: Australia
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
2 freelancers are bidding on average $2,000 AUD for this job

Hello, I’m a hydraulic engineering professional with 20+ years of experience in drainage design and building-related engineering assessments. I understand you need a site-specific report explaining why your tiled balcony ponds water, how inadequate falls and waterproofing may contribute to water ingress, and what practical rectification works are required. My proposed scope includes: - Review the construction plans, photographs, and existing balcony details. - Assess falls, drainage performance, ponding, and potential waterproofing failure. - Reference applicable NCC provisions and Australian Standards, including AS 4654.2 and AS 3500. - Prepare site-specific calculations, rectification recommendations, and marked-up drawings showing proposed falls, drains, and membrane details. - Compile a clear technical report for builders and insurers, with site observations and supporting evidence. Budget: AUD $1,500–$2,500, subject to site location, access, and assessment complexity. Timeline: 3–5 business days after the site inspection and receipt of the construction plans. Best regards, Charles
$1,500 AUD in 3 days
0.0
0.0

Brisbane, Australia
Member since Apr 5, 2022
£250-750 GBP
€250-750 EUR
$250-750 USD
$250-750 CAD
$30-250 USD
₹400-750 INR / hour
£20-250 GBP
$30-250 AUD
₹12500-37500 INR
$250-750 USD
$1500-3000 AUD
$250-750 USD
$30-250 USD
$100-200 USD
$250-750 USD
$250-750 USD
₹600-1500 INR
$250-750 USD
$250-750 USD
$250-750 USD