
Closed
Posted
Paid on delivery
Our commercial build is moving fast, and I need a dedicated hand to keep every trade aligned, every cost visible, and every stakeholder in the loop. Your focus will be threefold: • Scheduling and timeline management – maintain a live master programme, flag risks early, and issue look-ahead schedules so crews always know what’s next. • Budget tracking and cost control – update the cost ledger, compare actuals to estimates, and highlight variances before they snowball. • Communication with stakeholders – funnel updates to architects, engineers, subcontractors, and owners; organise concise weekly reports and on-site coordination meetings. You may jump in during planning, active construction, or even final close-out; the tools you use (MS Project, Primavera P6, Procore, or similar) are up to you as long as the data stays clear and exportable. Key deliverables will be: an approved baseline schedule, weekly progress snapshots, current cost dashboard, and a brief status memo each Friday. Accuracy, transparency, and proactive problem-solving are how we’ll measure success.
Project ID: 40755235
2 proposals
Remote project
Active 5 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
2 freelancers are bidding on average ₹19,825 INR for this job

Navigating the complexities of a fast-paced commercial build requires meticulous coordination to ensure every trade is aligned and every cost is transparent. My approach centers on creating a live master program that flags risks early, ensuring your teams are always prepared for what’s next. I’ve successfully managed similar projects where timely updates were crucial for keeping stakeholders informed. This includes organizing concise weekly reports and on-site meetings that drive accountability. I plan to use MS Project for its clarity and exportability, allowing for efficient budget tracking and cost control. To kick off, I suggest establishing an approved baseline schedule to set clear expectations. This will enhance transparency and support proactive problem-solving throughout the project. What specific tools or reports do you prefer for stakeholder communication? Junaid
₹17,650 INR in 7 days
0.0
0.0

I have spent 14 years on the contractor side running programme and cost control, mostly commercial builds, and the three things in your post are the day job rather than a side task: keeping the master programme live, keeping the cost ledger honest, and stopping architects, engineers and subs from talking past each other. What you would get from me: - Baseline programme with activity codes you can filter, plus a three-week look-ahead refreshed every Monday. - Cost ledger in Excel, committed / actual / forecast with variance flagged, so a problem shows up while it is still small. - One-page Friday memo: progress, slippage, cost movement, top three risks. No twenty-page packs. Tools: whichever you already license. P6 or MS Project for the schedule, plain Excel for the ledger, exportable so nobody needs a special viewer. You asked on the board whether site coordination is involved. I work remote off drawings, reports and site photos, and anything that genuinely needs eyes on the ground I flag the same day for your site team to check. That is how I have run builds without sitting on site. Before I put a firm finish date on it, two things I would want to know: how many packages are live right now, and do you want me to keep your existing programme running or build the baseline from scratch. Happy to take a short call first and agree the reporting format.
₹22,000 INR in 30 days
0.0
0.0

Chennai, India
Member since Oct 7, 2026
₹150000-250000 INR
$10-30 USD
₹12500-37500 INR
$750-1500 USD
$250-750 USD
$30-250 USD
$1500-3000 USD
$30-250 NZD
$30-250 NZD
₹600-1500 INR
₹600-601 INR
£20-250 GBP
₹12500-37500 INR
$2-8 AUD / hour
$20000-50000 USD
£18-36 GBP / hour
₹750-1250 INR / hour
$15-25 USD / hour
₹12500-37500 INR
$30-250 NZD