Optimal Reactive Power Dispatch (Electrical Engineer Required) -- 321
$30-250 USD
Dibatalkan
Disiarkan lebih dari 6 tahun yang lalu
$30-250 USD
Dibayar semasa penghantaran
ORPD OF POWER SYSTEM NETWORKS WITH DISTRIBUTED GENERATION USING PARTICLE SWARM OPTIMISATION
The project is about optimal reactive power dispatch with distributed generation of a case study system ie (IEEE 14Bus ) using particle swarm optimisation. The project should be done in Matpower and the results should be validated using Newton Raphson method. The distributed generation(DG) should be a wind turbine,Enercon E82 E4 with a power rating of 2500kw, and can deliver 1.2Mvar of reactive power and arbsorb 1Mvar. The results should show a decrease in transmission power loss when the DG is connected and operating at full speed. You can follow the attached document.
NOTE: PLEASE MAKE SURE THAT YOU DO BOTH SCENARIOS AS DISCUSSED IN THE ATTACHED PAPER. READ THE ATTACHED PAPER VERY CAREFULLY