Closed

Prepare Zinc Production Techno-Bankable Project Report

Hi,

I am interested in putting up a 1000 Tonnes per Annum SHG zinc metal production plant. Inputs I want to use is secondaries ( mainly zinc ash, EAF dust etc). I want to use leaching and solvent extraction low cost route . I am looking for someone who can prepare a bankable project report for this.

Basically i am looking for a Techno-Economic Project report wherein following would be major deliverable

1. Design a flow sheet based on Leach-SX-EW route

2. Prepare Project report: i.e land requirement, infrastructure requirement, process description, raw material specs, potential Indian/global suppliers, Equipment details & specs etc

3. Financials Capex, Opex & IRR

(Detail Engineering is not required)

Raw material: Galvanized zinc ash & EAF dust

Capacity required: 1000T per annum SHG Zinc

Location of Project: India

Regards

A Garg

Kemahiran: Kejuruteraan, Pengurusan Projek

Lihat lagi: indian suppliers, global equipment, upvc windows profiles production project report, prepare project report medical center, prepare project report investors, raw data college statistics project report, project report 3d production house, prepare project report magento project, prepare project report telemarketing, project report start tours travel, webcrawler project report, project report india

Tentang Majikan:
( 0 ulasan ) South Africa

ID Projek: #10100748

2 pekerja bebas membida secara purata ₹23706 untuk pekerjaan ini

daratmf

We are a group of engineers dedicated to provide the best quality consultancy service. In most cases we chose the projects that are interesting and challenging. Our minimum education level is MSc, but few of us are als Lagi

₹31111 INR dalam 15 hari
(7 Ulasan)
4.1
OBSindore

Hey there, We are a firm of chartered accountants having expertise in project management and allied aspects of it. For preparation of the said report we would reuire following specifuc information from your side: 1. Lagi

₹16300 INR dalam 5 hari
(0 Ulasan)
0.0