
Closed
Posted
Paid on delivery
I need a full-scope due-diligence report to guide my investment decision in a run-of-river hydropower scheme that is still at the early feasibility stage. The document must be written so it can also be shared with potential lenders, therefore it has to balance engineering depth with clear, defensible financial conclusions. What I expect you to cover • Technical condition and projected energy output – include resource assessment, preliminary design review, turbine selection logic, and availability assumptions. • Permits, legal rights and environmental compliance – map the current status of water rights, land agreements, EIAs, and any gaps that could delay financial close. • Financial model, costs and project risks – build or audit an XLS model with CAPEX/OPEX, tariff assumptions, debt parameters, sensitivity cases and a concise risk matrix. • detailed requirement can be referred to the attached SOW Acceptance criteria 1. All sources, calculations and assumptions clearly traceable. 2. Red-flag summary that can be lifted straight into an investment memo. Experience with hydropower engineering, renewable-energy financial modelling and regional permitting frameworks will be decisive. If you have recent examples of similar work, please mention them in your bid; NDAs can be arranged if needed.
Project ID: 40784162
30 proposals
Remote project
Active 9 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
30 freelancers are bidding on average $28,650 SGD for this job

⭐⭐⭐⭐⭐ Comprehensive Hydropower Due Diligence | Technical & Financial Feasibility Analysis ✳️ Hi. I've carefully reviewed your requirements and understand you're looking for a comprehensive, lender-ready due-diligence report for an early-stage run-of-river hydropower project. I can help assess technical feasibility, projected energy generation, turbine selection, regulatory compliance, environmental risks, and financial viability. The report will include a transparent Excel financial model, sensitivity analysis, risk matrix, and investment-focused red-flag summary. ➡️ Why Me? I have more than 5 years of experience in financial modelling, investment research, feasibility studies, and technical business analysis. I specialize in CAPEX/OPEX forecasting, project valuation, cash-flow modelling, risk assessment, and evidence-based investment reports. I'll ensure calculations, assumptions, and sources are traceable, with specialist engineering and regulatory findings clearly distinguished. ➡️ Let's have a quick chat to discuss your project in detail, and I can show you samples of my previous work. ➡️ Some of my similar work: ✅ Investment Due Diligence & Feasibility Studies ✅ Renewable Energy Financial Modelling ✅ CAPEX/OPEX & Cash Flow Forecasting ✅ Project Finance & Debt Sensitivity Analysis ✅ Investment Risk Assessment ✅ Financial Valuation & Scenario Modelling ✅ Investment Memorandums & Technical Reports Waiting for your response! Best Regards, Naresh
$20,000 SGD in 1 day
6.5
6.5

I can support the Excel-based financial and engineering analysis required for an early-stage hydropower investment review. My background spans engineering and data-driven technology solutions, with Excel skills suited to building or auditing transparent project models rather than presenting unsupported conclusions. For your run-of-river scheme, I can structure a traceable workbook covering CAPEX, OPEX, tariff assumptions, debt parameters, energy-output assumptions, sensitivities, and project-risk analysis. My engineering capability also aligns with reviewing resource and preliminary design information, documenting assumptions, and presenting findings clearly for investment and lender audiences. I can organise the due-diligence evidence into a concise red-flag summary, while clearly identifying any permitting, environmental, land-rights, or technical information gaps visible in the supplied materials. I would be pleased to apply my engineering and Excel expertise to produce a defensible report and model that supports your investment decision.
$20,000 SGD in 60 days
5.0
5.0

I bring extensive experience in hydropower engineering and renewable energy financial modeling, having successfully completed due diligence for similar projects that have guided significant investment decisions. My approach emphasizes clarity and transparency, ensuring that all technical and financial components are well-documented and easily understood for potential lenders. I have a strong track record of delivering comprehensive reports that meet rigorous standards and provide actionable insights, making me a reliable choice for this project.
$20,000 SGD in 7 days
4.8
4.8

Hi, Aashiq (Ash) here from Cape Town, South Africa. This project instantly caught my eye, so I had to reach out. I see you’re looking for a comprehensive due-diligence report for a run-of-river hydropower scheme, balancing technical depth with financial clarity. It’s crucial for guiding your investment and appealing to potential lenders. With extensive experience in hydropower engineering and renewable energy financial modeling, I have successfully helped clients navigate similar projects. My work includes detailed assessments of energy output, compliance with permitting frameworks, and creating robust financial models that highlight CAPEX/OPEX and project risks. I can provide relevant samples of my recent projects upon request. Based on what you mentioned, here is how we would approach the project: - Conduct a thorough resource assessment and review preliminary designs. - Map the current status of all legal and environmental compliance aspects. - Develop a detailed financial model with sensitivity analysis and a risk matrix. You can count on clear communication throughout the process, ensuring a seamless and user-focused solution optimized for performance. Best Regards, Aashiq
$45,000 SGD in 7 days
4.7
4.7

Engineering, finance, and advanced Excel are directly aligned with the core of your hydropower due-diligence requirement. As a full-service engineering and digital transformation agency, Aesthetic Logic can combine technical review with structured financial analysis in a lender-ready report rather than treating the project as an engineering or spreadsheet exercise alone. My engineering capability supports assessment of the preliminary design, resource and energy assumptions, turbine-selection rationale, availability inputs, and project constraints. Finance and Excel support a traceable model covering CAPEX, OPEX, tariffs, debt parameters, sensitivities, assumptions, and a concise risk matrix. I will present source references, calculations, and assumptions clearly, with a red-flag summary suitable for direct use in an investment memo. I can also structure the review of permits, water rights, land agreements, EIA status, and outstanding compliance items within the broader project-risk assessment.
$35,000 SGD in 3 days
4.1
4.1

My experience delivering feasibility studies, project-finance analysis, and investment-grade financial models for renewable-energy clients directly matches the lender-ready decision support this run-of-river hydropower investment requires. I work with investment teams and executive leadership on high-stakes analysis, translating complex project assumptions into clear, defensible conclusions. I can prepare or audit the Excel model across CAPEX, OPEX, tariffs, debt parameters, cash flows, sensitivities, and scenario analysis, with calculations and assumptions clearly traceable. My background in renewable energy, financial analysis, valuation, market research, and commercial due diligence also supports a structured review of project economics, key risks, and feasibility-stage investment considerations. I will present findings in concise business writing, including a red-flag summary suitable for an investment memo and lender discussions. I would welcome the opportunity to deliver a rigorous, decision-ready due-diligence report for this hydropower project.
$20,000 SGD in 7 days
3.1
3.1

Greetings! I can deliver a full-scope due-diligence report for your run-of-river hydropower scheme at early feasibility stage, written to balance engineering depth with clear, defensible financial conclusions for both your investment decision and potential lenders. I'll cover technical condition and projected energy output including resource assessment, preliminary design review, turbine selection logic and availability assumptions; permits, legal rights and environmental compliance mapping water rights, land agreements, EIA status and gaps that could delay financial close; and a financial model with CAPEX, OPEX, tariff assumptions, debt parameters, sensitivity cases and a concise risk matrix, all with sources, calculations and assumptions clearly traceable. You'll also get a red-flag summary ready to lift straight into an investment memo. Happy to mention recent hydropower engineering, renewable-energy financial modelling and regional permitting experience, with NDAs if needed. Thanks, Revival
$20,000 SGD in 30 days
2.6
2.6

Hi, My name is Adam. I checked your requirements carefully and understood what you want to do. The key challenge is integrating early-stage hydrology, preliminary engineering, Brazil-specific permitting, and lender-grade financial assumptions into defensible investment conclusions. I will structure the review around traceable sources and calculations, audit or build the XLS model with sensitivities, and produce a concise red-flag summary aligned with the attached SOW. I can start work immediately and complete asap. Best, Adam
$20,000 SGD in 2 days
0.0
0.0

⚡ THIS IS RIGHT UP OUR ALLEY. We recently completed a comprehensive due diligence report for a run-of-river hydropower project, balancing technical insights with financial rigor. What matters most here is ensuring your investment decision is informed by solid engineering assessments and clear financial conclusions. We’ll cover technical conditions, including resource assessments and turbine selection, while also mapping out the legal and environmental compliance landscape. A detailed financial model will be created, with all assumptions traceable. I personally oversee communication, coordinate our specialists, and ensure every aspect is thoroughly checked before delivery. REACH OUT, LET'S KEEP THIS SIMPLE. Regards, Stefan Clavorn Collective
$25,000 SGD in 14 days
0.0
0.0

Early-stage run-of-river hydro investments carry significant resource and permitting uncertainties that can stall debt financing if assumptions are not thoroughly stress-tested. A practical approach involves evaluating the raw flow data against turbine selection logic, mapping critical-path gaps across water rights and environmental approvals, and structuring a traceable financial model to assess debt service under conservative tariff sensitivities. This will produce a clear, lender-ready report paired with an actionable red-flag summary for your investment memo. What specific multi-year hydrological gauging records are currently available for the site? Regards, Sonny Dube
$35,000 SGD in 7 days
0.0
0.0

You don't need another generic AI-generated "proposal". You need ME. I specialize in renewable-energy financial modeling and have extensive experience in hydropower engineering. I understand the importance of balancing technical depth with clear financial conclusions. Your project requires a comprehensive due diligence report that not only assesses the technical condition and projected energy output but also details the financial model and project risks. To enhance your report, I suggest including a clear traceability matrix for all sources, calculations, and assumptions, which would streamline the review process for potential lenders. With my extensive experience and prompt delivery, I can assure you of high-quality work. I’m new to Freelancer, so I’m offering a reduced introductory rate to build my profile and reviews here. What specific timeline do you have in mind for this project? Warm regards, Monique
$20,000 SGD in 7 days
0.0
0.0

Singapore, Singapore
Payment method verified
Member since Sep 28, 2026
$10000-20000 USD
$20000-50000 USD
₹12500-37500 INR
₹750-1250 INR / hour
$25-50 AUD / hour
min €36 EUR / hour
$30-250 USD
$30-250 USD
₹37500-75000 INR
$30-250 AUD
$10-50 USD
$20000-50000 USD
€5-10 EUR / hour
$20000-50000 SGD
$30-250 USD
$15-25 USD / hour
£10-20 GBP
$20000-50000 SGD
₹600-1500 INR
$10-300000 USD
$5000-10000 USD
$10-30 USD