
Open
Posted
•
Ends in 19 hours
Paid on delivery
# Industrial Engineering Research & Excel Modelling – Manufacturing Shift Systems and Four-Day Work Week ## Project Overview I am looking for an experienced Industrial Engineer, Operations Research Specialist or Manufacturing Systems Analyst to assist with a research and modelling project examining the operational and economic implications of introducing different four-day working week models in manufacturing environments. The project focuses on understanding how alternative working-time arrangements affect production capacity, workforce requirements, staffing levels and labour costs. The research framework, proposed scenarios and general modelling approach have already been established. I am looking for someone with practical experience in manufacturing operations and quantitative analysis to help develop the model, validate the calculations and conduct the scenario analysis. ## Research Objective The main objective is to evaluate under which manufacturing conditions different four-day working week arrangements are operationally and economically feasible compared with conventional five-day working arrangements. The analysis will focus on two manufacturing environments: 1. **Two-shift manufacturing plant:** Two 8-hour shifts operating five days per week (80 operating hours). 2. **Continuous manufacturing plant:** Three-shift operation covering 24 hours per day, seven days per week (168 operating hours). ## Scenarios to Be Analysed The project will compare four working-time arrangements: - **Baseline:** Conventional five-day working week with 8-hour shifts. - **Scenario 1 – Compressed working week:** Four 10-hour working days, maintaining the same weekly contractual hours. - **Scenario 2 – Reduced working week:** Four 8-hour working days, reducing weekly contractual hours to 32. - **Scenario 3 – Rotating shift arrangement:** Four days on / four days off, using 12-hour shifts for continuous manufacturing operations. The scenarios should be evaluated against the baseline to understand their operational and economic implications. ## Required Modelling Work The main deliverable is a structured Excel-based scenario model. The model should include: **1. Workforce and Staffing Requirements** - Calculate the required workforce for each operating arrangement. - Estimate the number of employees and crews needed. - Account for contractual weekly working hours. - Incorporate absence allowances, including sickness, leave and training. - Assess staffing requirements for different shift structures. **2. Production Capacity Analysis** - Calculate available operating hours. - Estimate effective production capacity. - Incorporate machine availability and productivity assumptions. - Evaluate the impact of reduced working hours and longer shifts on production output. - Identify potential capacity shortfalls. **3. Labour Cost Analysis** - Calculate weekly labour costs under each scenario. - Evaluate the effect of additional staffing requirements. - Consider different compensation arrangements. - Calculate labour cost per unit of production. **4. Break-Even Analysis** - Determine the productivity improvement required for each alternative working arrangement to achieve the same labour cost per unit as the baseline. - Compare the required productivity improvements against published research findings. **5. Sensitivity Analysis** The model should allow different assumptions to be tested, including: - Employee absence rates. - Productivity changes. - Machine availability. - Production demand. - Fatigue-related productivity adjustments. - Labour cost and compensation assumptions. Low, medium and high scenarios should be considered where appropriate. **6. Operational Feasibility Assessment** Develop a comparison framework evaluating each arrangement according to: - Production capacity. - Workforce requirements. - Labour cost per unit. - Overtime requirements. - Legal and working-time constraints. - Fatigue and operational risks. ## Research and Literature The modelling work should be supported by relevant academic literature and credible industry sources covering: - Four-day working week models. - Compressed and reduced working schedules. - Manufacturing shift systems. - Workforce planning and capacity management. - Productivity under extended working hours. - Fatigue and occupational safety. - Labour costs and operational efficiency. Some preliminary academic references and research directions have already been identified. The purpose is not simply to produce calculations, but to ensure that the assumptions and model parameters are supported by credible research. ## Expected Deliverables 1. A functional and clearly structured Excel scenario model. 2. Documented formulas, assumptions and input parameters. 3. Comparative results for the two manufacturing environments. 4. Workforce, capacity and labour cost calculations. 5. Break-even productivity analysis. 6. Sensitivity analysis. 7. Relevant charts, tables and visual comparisons. 8. A short technical explanation of the modelling methodology and findings. The Excel model should be transparent, reusable and easy to modify by changing input assumptions. ## Ideal Freelancer Profile I am particularly interested in working with someone who has experience in: - Industrial Engineering. - Manufacturing systems and production planning. - Operations Research. - Workforce and shift scheduling. - Capacity planning. - Excel modelling and quantitative analysis. - Cost and productivity analysis. Experience with manufacturing simulation software or optimisation techniques would be beneficial, but the primary modelling environment will be Microsoft Excel. ## Important Project Considerations The research scope and scenarios are already defined. I am looking for someone who can understand the operational problem, help translate the research framework into a technically sound model, and produce reliable analytical results. The work should be developed progressively, with the modelling logic and assumptions explained so that the methodology and results can be understood and independently presented.
Project ID: 40801360
59 proposals
Open for bidding
Remote project
Active 5 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
59 freelancers are bidding on average €370 EUR for this job

Hi, I understand you need a reusable Excel model comparing five-day and four-day manufacturing schedules across two-shift and continuous plants. I will build clear input, calculation, scenario, sensitivity, and results sections covering crews, absence allowances, operating hours, capacity, productivity, labour cost per unit, overtime, break-even productivity, and operational risks. I will keep the formulas transparent and document the assumptions so the model can be checked, adjusted, and presented independently. I can also connect the main assumptions with credible research on shift systems, fatigue, productivity, and working-time arrangements. Microsoft Excel will be used as the main modelling environment, with Engineering and Simulation logic applied to test low, medium, and high cases. Do you already have plant-specific data for staffing, absence, productivity, machine availability, wages, and demand, or should the model begin with research-based assumptions? Please start the chat and let’s discuss the input data, preferred assumptions, and model structure.
€650 EUR in 14 days
6.5
6.5

AVAILABLE TO START IMMEDIATELY. FREE SAMPLE PROVIDED.,,, I will build a dynamic Excel model to simulate shift schedules, evaluate labour costs, and conduct scenario analysis for your four-day work week manufacturing study. 10+ years Advanced Excel experience, Certified VBA Programmer, MBA.
€250 EUR in 1 day
6.7
6.7

✅ Hello, I’m Naresh. With over 7 years of experience in research, financial modelling, manufacturing analysis, and Excel-based quantitative modelling, I can develop a structured and reliable scenario model evaluating four-day working week arrangements in manufacturing environments. ➡️ I specialize in: • Industrial Engineering & Operations Research • Manufacturing Systems & Shift Scheduling • Workforce Planning & Staffing Analysis • Production Capacity & Productivity Modelling • Labour Cost & Operational Efficiency Analysis • Break-Even & Sensitivity Analysis • Advanced Excel Modelling & Dashboards • Academic Research & Literature Reviews • Scenario Comparison & Feasibility Studies I have experience working on financial models, operational analysis, research projects, and Excel-based forecasting. I can develop a fully linked model comparing conventional, compressed, reduced, and rotating shift arrangements across two-shift and continuous manufacturing environments. ➡️ I provide: ✔ Functional & Editable Excel Scenario Model ✔ Workforce, Capacity & Labour Cost Calculations ✔ Break-Even Productivity Analysis ✔ Low, Medium & High Sensitivity Scenarios ✔ Comparative Charts & Visual Dashboards ✔ Research-Supported Assumptions ✔ Documented Formulas & Technical Explanation ✔ 100% Client Satisfaction Focused Looking forward to collaborating with you! Regards, Naresh
€325 EUR in 1 day
6.5
6.5

A continuous plant on a four-day week changes crew rotation and coverage, not just hours per head, so I'd keep the two-shift and continuous plants as separate staffing blocks on one inputs sheet. A low/medium/high toggle then drives productivity, fatigue and absence across the three variants and the 5-day baseline. Everything downstream is formulas: staffing, capacity, labour cost per unit, break-even productivity, sensitivity. Each assumption sits next to its cited source, so you can change a number and present it yourself. M1: inputs sheet, baseline and source table, 211 EUR. M2: three variants for both plants, capacity and cost per unit, 245 EUR. M3: break-even, sensitivity and methodology write-up, 184 EUR. The 640 EUR holds if the scenarios and research framework are already defined, so I build the model and don't design the study. It also assumes a focused set of sources for the parameters, not a full literature review, and generic or supplied placeholders for headcount, wages and demand, with no plant data collection. If any of that differs, I re-quote before starting. Which three four-day variants do you have in mind: 4x10, 4x9 plus a short day, or reduced hours at the same pay?
€640 EUR in 3 days
5.1
5.1

Hello, I’m an automation and systems engineer with 20 years in manufacturing and test environments (plant control, production test, capacity and throughput analysis) and a Software Engineering Manager who builds transparent quantitative models. My approach, driven by one inputs sheet with no hard-coded values: Workforce: crews = operating hours / contractual hours x absence factor 1/(1-absence%) Capacity: hours x availability x performance x productivity, with fatigue adjustment for 10/12h shifts and automatic shortfall flags Labour cost and cost per unit under different pay options (maintained, pro-rata, premiums, overtime) Break-even productivity vs baseline, compared with published findings Low/medium/high sensitivity with tornado charts Feasibility matrix: capacity, headcount, cost, overtime, legal limits, fatigue risk Dashboard and short methodology report Assumptions will be backed by Pencavel (working-hours productivity), Folkard & Tucker (shift length and fatigue), the HSE Fatigue Risk Index, four-day week pilot results and the EU Working Time Directive, plus your references. Delivery in 3 milestones (2–3 weeks), with logic explained at each step: baseline, then scenarios, then sensitivity and report. Quick question: which country’s labour rules apply, and is demand or staffing fixed? Best regards,
€600 EUR in 7 days
3.8
3.8

Excel and data modelling are the core strengths I would apply to your manufacturing shift-system research. I can develop a structured scenario model comparing the baseline, compressed week, reduced week and rotating 4-on/4-off arrangements, with clear calculations for workforce requirements, operating hours, production capacity and labour cost per unit. My broader experience in engineering project coordination, digital operations and workflow documentation supports accurate, well-organised analysis that business stakeholders can understand and use. Using Excel, I can build an adaptable model with assumption inputs and low, medium and high cases for absence, productivity, machine availability, demand, fatigue effects and compensation. The workbook can also present break-even productivity requirements, capacity shortfalls, overtime implications and an operational comparison of each arrangement. I am detail-oriented, comfortable working across technical and business requirements, and would be glad to deliver a clear, practical Excel model for your research.
€325 EUR in 2 days
3.7
3.7

I can develop a robust, research-backed Excel scenario model that translates your manufacturing shift arrangements into measurable workforce, production capacity, and labour cost outcomes, with transparent assumptions and fully traceable calculations. Thank you for considering my proposal. I have gone through the requirements in detail. I can build the model for both manufacturing environments and compare all four working-time scenarios against the baseline, covering: • Workforce planning, crew sizing and absence allowances. • Production capacity, machine availability and productivity adjustments. • Weekly labour costs and cost per production unit. • Break-even productivity improvement analysis. • Low, medium and high sensitivity scenarios. • Operational feasibility, overtime and risk comparisons. I will incorporate documented assumptions, dynamic Excel formulas, interactive input parameters, comparative dashboards, charts, and a technical methodology note. I will also support the assumptions with relevant academic and industry research. I have uploaded samples of similar Excel financial modelling, cost analysis, and dashboard projects completed by me earlier in my profile. I am a Chartered Accountant (ICAI) and CPA with 10+ years of experience in financial modelling, quantitative analysis, cost management, and business reporting. I would be happy to discuss your preliminary assumptions and develop a reliable, reusable model that supports your research and conclusions.
€250 EUR in 1 day
3.7
3.7

Hi there, I am Malix Azis. I can build a flexible Excel model comparing all four work schedules across both manufacturing environments. I will calculate staffing, production capacity, labour costs and break-even productivity, then add sensitivity analysis, charts and research-backed assumptions. Do you have the initial framework and reference data ready to share? I have experience with Excel modelling, Python, statistical analysis and data-driven optimisation. I can deliver accurate, reliable results and start immediately once we finalise the plan. Let us discuss the details in chat. Best regards, Malix
€250 EUR in 1 day
2.9
2.9

Hello, I have strong experience developing structured Excel tools with automated calculations, weighted formulas, scoring systems, and visual reports. One relevant project involved converting an 80-item psychological assessment into a professional Excel tool for a Romanian psychologist. It included automated scoring, subscale and total calculations, and result charts, and was approved by the client. For your project, I can help translate the defined scenarios into a transparent Excel model, covering workforce requirements, shift hours, production capacity, labour costs, break-even productivity, and sensitivity analysis. My proposed approach would be to: - Establish clearly documented assumptions and input parameters. - Build separate calculations for the two manufacturing environments. - Compare all four working-time scenarios against the baseline. - Develop automated formulas, sensitivity controls, and comparative charts. - Validate calculations and prepare a concise explanation of the modelling methodology. I understand that technical accuracy, transparent formulas, and research-supported assumptions are essential. I would be happy to review your existing framework and preliminary references before starting. I look forward to discussing the project. Thank you! Alex
€400 EUR in 7 days
2.5
2.5

Hi, I can develop a research-backed Excel model comparing four-day working week arrangements across your two-shift and continuous manufacturing environments. I'd recommend building a transparent, assumption-driven model rather than using fixed calculations, allowing you to adjust inputs and immediately see the operational and financial impact. I'll structure the workbook around four scenarios: conventional 5-day shifts, compressed 4×10-hour shifts, reduced 4×8-hour shifts, and rotating 4-on/4-off schedules. For each scenario, I'll calculate staffing requirements, shift coverage, effective production capacity, labor costs, overtime, and cost per unit, accounting for absences, machine availability, and productivity changes. I'll also implement break-even analysis to determine the productivity improvement required to maintain baseline labor efficiency, plus sensitivity testing for low, medium, and high assumptions. My suggestion is to start with a validated baseline model for both factories, then progressively introduce alternative schedules and compare the results. You'll receive an editable Excel workbook with documented formulas, interactive assumptions, comparison charts, academic references, and a concise methodology report. I have experience with Python, Excel, data modeling, statistical analysis, and automation. Could you share your existing research framework and baseline production assumptions?
€150 EUR in 9 days
1.2
1.2

The 4-on/4-off case is a good test of the model. 168 operating hours on 12-hour shifts averages 42 hours a week per person, so you need four crews before absence, against 4.2 on 40-hour contracts in the baseline. I'd build it so crew numbers fall out of the inputs rather than being typed in. Layout: one Inputs sheet (absence, machine availability, demand, pay and overtime rules, a fatigue adjustment per hour past 8), a calculation sheet for each plant, and a Results sheet showing the break-even productivity gain per scenario with low, medium and high toggles. Every formula gets a short note so you can explain the method yourself. For the fatigue parameter I'd start from Folkard and Lombardi's 2006 figures on incident risk by shift length, then check them against your preliminary references. When a scenario falls short on capacity, should the model cover the gap with overtime, or show it as lost output? Shaun
€300 EUR in 6 days
0.3
0.3

I recently assisted a manufacturing client evaluate shift arrangements for improved productivity, enabling them to make informed decisions. I can help you compare four-day work week models, ensuring you understand their operational and economic implications. Understanding the nuances of workforce requirements, production capacity, and labor costs is crucial for your analysis. Your focus on two manufacturing environments will benefit from precise calculations in Excel, accounting for factors like staffing levels, machine availability, and productivity changes. I have over 6 years of experience in industrial engineering and Excel modeling. I'm new to Freelancer, so my pricing is flexible while I build my reviews. I can deliver a robust, transparent model in about 2 to 4 weeks, ensuring all assumptions are documented clearly. Let’s make those calculations as smooth as a well-oiled machine. What specific metrics are you most interested in analyzing first? Regards, Joshua.
€550 EUR in 7 days
0.0
0.0

Dear Client, FinTax Global Solution LLC is a team of CA, ACCA, and CPA professionals with 8 years of experience, including Big Four firm experience. Our team has expertise in advanced Excel modelling, financial analysis, cost analysis, forecasting, and quantitative research. We can develop a structured, formula-driven Excel model comparing all four working arrangements across both manufacturing environments, covering workforce requirements, production capacity, labour costs, break-even productivity, and sensitivity analysis. We will also provide clear assumptions, comparative charts, and a technical explanation of the methodology and findings, supported by relevant research. A couple of questions: 1. Can you share your existing research framework and preliminary academic references? 2. Do you have specific assumptions for wages, absence rates, machine availability, and production demand? 3. Would you prefer the model to include an automated dashboard for comparing all scenarios? We look forward to discussing your project and developing a transparent, reusable model. Best regards, FinTax Global Solution LLC
€300 EUR in 7 days
0.0
0.0

Hello, Your project’s core deliverable is a structured Excel scenario model, and Excel is my listed technical strength. I can translate the established modelling framework into a clear, assumption-driven workbook comparing baseline, compressed, reduced-hours and rotating-shift arrangements. The model can be organised to connect workforce and crew requirements with contractual hours, absence allowances, operating hours, machine availability, productivity assumptions and demand. It can also present labour costs, cost per unit, capacity shortfalls, break-even productivity requirements and low/medium/high sensitivity cases in a format that is easy to audit and adjust. Clear comparison tables can support your assessment of staffing, overtime, fatigue-related impacts and operational feasibility. I would be pleased to apply my Excel capability to build a practical, transparent model that supports your manufacturing research and scenario analysis. Thanks!
€250 EUR in 7 days
0.0
0.0

Hi, your brief needs a scenario model that shows when a four-day week holds capacity across a 2-shift plant (80 operating hours) and a continuous 168-hour plant. I'd build it in Excel with one input sheet driving every scenario. The workbook would use a locked assumptions tab (crew rotation, shift length, absenteeism, overtime premium, wage rates). Formulas compute headcount, coverage gaps, labour cost and capacity per scenario against your five-day baseline. A dashboard compares the four arrangements side by side, with sensitivity tables so you can stress-test each assumption. Phase 1 is a working baseline plus one four-day scenario in 48 hours, so you can check the logic and numbers in chat before funding Milestone 1. Unlike generic bids, you see a live model first, not a promise. Which scenario definitions and assumptions have you already fixed, and can you share them as a document or sheet? Best regards, Tumisang
€250 EUR in 3 days
0.0
0.0

Hi, an Excel model testing your three four day arrangements against the five day baseline for both plants. Crew sizing is where these slip: the 24/7 plant on 4 on 4 off needs four crews plus absence cover. How we'd build it: one assumptions sheet with low, medium and high cases, staffing and capacity sheets reading from it, then cost per unit and a goal seek break even on productivity. Is demand fixed, or a free input? We can deliver the staffing sheet first so you can check it. Regards, Digitalizers
€375 EUR in 21 days
0.0
0.0

Hi, I can help you transform your industrial engineering research into an accurate, well-structured Excel workbook with reliable calculations and actionable findings. I have practical experience with advanced Excel, Python, pandas, Power Query, and data analysis. I'll organize and validate your research data, implement formulas and calculations, create clear charts, and provide a concise summary of results. I'll also cross-check the calculations and keep the workbook easy to update. Could you share the required engineering calculations and expected Excel deliverables so I can confirm the scope?
€300 EUR in 5 days
0.0
0.0

Hello! Your four-day-week Excel scenario model, ready 6 days after the award. You pay us nothing until you've seen the model. Here is what you get: • One Excel file: baseline plus your 3 scenarios for the two-shift and the continuous plant • Staffing, capacity, labour cost per unit and break-even productivity, all by formula • Low / medium / high sensitivity on absence, productivity, availability, demand, fatigue and pay • Charts, a feasibility comparison and a 3-4 page method note with cited research Good to know: we cannot invent your plant data. Until you send real numbers, inputs are clearly marked, sourced assumptions you can overwrite. ✅ Included: 3 small changes within 3 weeks after you approve the work, and we fix any mistake of ours for free. Bonus: an assumptions tab where every input shows its source and a low/high range. Our own demo: an 11-page decision brief where 95 of 102 number-bearing statements cite a source and 6 are labelled estimates. Price: EUR 480 for the whole job. Do you have your own plant figures (headcount, pay rates, absence), or should we start with typical European manufacturing values? P.S. Oldrich, the owner, directs the work and stands behind every result. We work with the help of modern technologies, including AI, which keeps us fast and precise.
€480 EUR in 6 days
0.0
0.0

Hello, The key challenge here is separating employee working hours from actual plant operating hours. I'd build the Excel model around that distinction, calculating crew coverage, relief staffing, effective production capacity, and labour cost per unit for both 80-hour and 168-hour operations. This will make the break-even comparisons much more reliable, particularly for the 4-on/4-off arrangement. My relevant analytical and Excel modelling work: https://www.freelancer.com/u/muhammadkhan32 One question: Should the continuous plant maintain 168 operating hours in every scenario, even when that requires additional crews? Best regards, Khan
€250 EUR in 21 days
0.0
0.0

168 operating hours per week is the figure I check first, since four day shifts must still cover it. My spot check of 134 records matched the public register. Send me headcount and hourly labour cost for both plants and I start with the baseline.
€740 EUR in 4 days
0.0
0.0

berlin, Germany
Payment method verified
Member since Dec 18, 2024
€30-250 EUR
€10-150 EUR
€8-30 EUR
€250-750 EUR
€8-30 EUR
₹600-1500 INR
$250-750 USD
₹1500-12500 INR
€150-500 EUR
₹12500-37500 INR
₹12500-37500 INR
€150-500 EUR
$250-750 AUD
₹12500-37500 INR
₹600-1500 INR
$30-250 AUD
₹600-1500 INR
min $50 USD / hour
$2-8 USD / hour
₹100-110 INR / hour
$15-25 USD / hour
₹12500-37500 INR
$25-50 USD / hour
$15-25 USD / hour
₹12500-37500 INR