
Ditutup
Disiarkan
Dibayar semasa penghantaran
This project centres on building a full Glass Reinforced Concrete production facility that keeps capital and running costs under tight control. The scope runs end-to-end: designing an efficient line layout, sourcing every critical raw material, and specifying plus installing the machinery that turns those materials into finished GRC elements. What I expect: • A practical production-line layout and process-flow diagram that shows how we move from batching through spraying, curing, trimming and packing. • A vetted supplier list for cement, alkali-resistant glass fibre, polymers, admixtures and ancillary consumables, including approximate lead times and minimum order quantities. • An equipment schedule detailing spec, capacity, energy requirements and footprint for mixers, spray stations, mould handling, curing racks and finishing tools, along with an installation and commissioning roadmap. Success will be measured by how clearly the plan minimises waste, labour hours and upfront spend while protecting product quality and safety. If you have proven experience setting up concrete, GRC, or composite manufacturing lines, please highlight that background—case studies, plant photos, or brief descriptions of past roles are ideal.
ID Projek: 40330660
Projek jarak jauh
Aktif 56 tahun yang lalu
Tetapkan bajet dan garis masa anda
Dapatkan bayaran untuk kerja anda
Tuliskan cadangan anda
Ianya percuma untuk mendaftar dan membida pekerjaan

Jodhpur, India
Ahli sejak Mac 5, 2026
₹600-601 INR
$250-750 USD
$30-250 NZD
$10-30 USD
₹12500-37500 INR
$5000-10000 USD
$250-750 USD
$10-30 AUD
$750-1500 USD
$150-250 USD
$15-25 USD / jam
$20000-50000 USD
$30-250 USD
$10-30 USD
$750-1500 USD
$30-250 CAD
$20000-50000 CAD
₹1500-12500 INR
$30-250 USD
₹100-400 INR / jam
$10-30 USD