Telah Dianugerahkan

Design by MATALB Wind Synchronce Generator

Design by MATALB Maximum Power Point Tracking Permanent Magnet Syynchronous Generator for large Wind Turbine

by using tip speed ratio controll with tow mass model.

Kemahiran: Kejuruteraan Elektrik, Matlab and Mathematica

Lihat lebih lanjut: synchronce, speed by design, mass design, design generator, wind turbine, turbine, matalb, generator, engineering design, electrical power, design turbine, power generator matlab, electrical design wind turbine, wind turbine design matlab, electrical matlab , maximum power point tracking wind matlab, wind turbine design, design power generator matlab, matlab wind turbine, tracking point, model wind, model wind turbine, wind generator design, turbine matlab, wind power matlab

Tentang Majikan:
( 0 ulasan ) Newcastle upon tyne, United Kingdom

ID Projek: #1583619

5 pekerja bebas membida secara purata £596 untuk pekerjaan ini

MikroStar

hi,i can help.

£600 GBP dalam 3 hari
(48 Ulasan)
6.3
RfPhD

,,,,,,,,,,,,,,,,,,,,,,,,,,,,

£750 GBP dalam 10 hari
(22 Ulasan)
5.7
bchandra1955

Professional engineer working on wind energy projects can take care

£630 GBP dalam 9 hari
(24 Ulasan)
4.9
reallifetech

Dear Sir, We are Reserach and Development company whose working area are : -Digital Motor Control -Analog Design -Electronic Design -Power Electronics -PCB design -Embedded system -Matlab -Simulation of ha Lagi

£700 GBP dalam 12 hari
(12 Ulasan)
4.2
mincingthought

Hi,I can do this task.I have experience in Matlab,Power generation simulations.

£250 GBP dalam 7 hari
(0 Ulasan)
0.0
Vicariusindia

Please check the PM for more info.

£800 GBP dalam 25 hari
(0 Ulasan)
0.0