
Open
Posted
•
Ends in 23 hours
Paid on delivery
Project: Build FDV4 (Phase 1 MVP) — Web & Mobile Summary We’re hiring freelance developers to build the first production-ready modules of FDV4, a digital platform for Facilities Management (FDV) of buildings and infrastructure (bridges, dams, offshore platforms, terminals). The MVP must ship fast, cover role-based dashboards, basic inspections/reporting, and 3D (GIS/BIM) viewing, and run on web and mobile with online/offline field capture. Short timeline; strong delivery may lead to a larger follow-on scope. Primary users: asset owners and infrastructure operators. Goals (Phase 1 MVP) Deliver a usable slice that proves: Smooth sign-up/sign-in and role-based access. A configurable dashboard (incl. “traffic-light” status indicators). Creation of inspections with photos/notes (offline on mobile, with sync). Read-only 3D model viewing and linking to assets/inspections. Basic notifications and document navigation (breadcrumbs). These priorities come from prior EXCON/FDV4 discussions: SSO with email+password; role-based views; traffic-light status; customizable dashboards; early data visualizations; monitoring of stress thresholds/estimated lifetime; 3D with GIS/BIM compatibility; emissions/cost splits by component; notifications; mobile capture/inspect/report (offline); document breadcrumbs; and backend with GIS/BIM server + integration bus. EXCON H1 establishes a TEA decision model and data backbone (LCA/LCC etc.) that FDV4 should later interface with; Phase 1 only lays foundations for that. Scope & Deliverables 1) Authentication & Roles Email+password sign-up/sign-in (no separate username), secure hashing, token/session, password reset. Role model in backend (owner / consultant / field / admin) with simple policy checks. Grounded by SSO simplification and role-based functions. 2) Role-Based Dashboard Configurable cards for assets, inspections due/overdue, open findings. “Traffic-light” (green/amber/red) indicators for status/risks. Quick links per role; hide non-relevant metrics for consultants (e.g., lifecycle/carbon). Backed by meeting points on traffic lights, role-based quick access, and customizable dashboards. 3) Inspections & Reporting (Web + Mobile) Create inspection, add notes/photos, tag asset/location; offline capture on mobile with deferred sync. Basic list/detail views and export (PDF/CSV) for reports. Field app UX optimized for speed. Matches the “capture–inspect–report”, online/offline requirement. 4) 3D Viewer (Read-Only) Load a sample structure (IFC/glTF/etc.), orbit/pan/zoom. Click an element to show metadata and related inspections. Prepare hooks for future annotations. Must be compatible with existing GIS/BIM systems. 5) Notifications (Basic) Server-side rules for due inspections / new critical findings → in-app alerts (email optional in Phase 1). As discussed re: alerting and threshold-based criticality. 6) Document Handling (Starter) Upload + folder/tags; breadcrumb navigation. Per the “breadcrumbs & categorization” item. Non-Goals (Phase 1) Full TEA/LCA/LCC analytics, advanced forecasting, complex workflows—these come later, informed by EXCON H1 outcomes. Tech Preferences (open to proposals) Web: React/Angular/Vue + TypeScript; charting; 3D via [login to view URL] or similar. Mobile: Cross-platform (React Native or Flutter) with offline store (SQLite/IndexedDB) + sync. Backend: REST/GraphQL (Node/Express/NestJS, Python/FastAPI/Django, .NET, or Java/Spring). Data: SQL (PostgreSQL + PostGIS if GIS), optional document store for files/images. Integrations (prepare): GIS/BIM server, service bus for system integration, API layer for data “translation”. Quality & Security Clear module boundaries, README, env samples, seed data. Basic unit tests on core logic; lint/format; OWASP-aware auth/inputs. Containerized dev env (Docker) preferred. Collaboration Rapid, agile delivery; weekly demos. Chat on Discord/Teams (Discord suggested in notes). Git repo (feature branches + PRs). Short feedback cycles. Budget & Timeline Budget: NOK 100,000 for Phase 1. Timeline: Short; propose a realistic 3–6 week plan with milestones below. Suggested Milestones Week 1: Auth + role model + skeleton web/mobile; data model; CI. Week 2: Role-based dashboard + traffic lights + notifications (basic). Week 3: Inspections (web/mobile, offline capture & sync). Week 4: 3D viewer (read-only) + asset linkage; docs upload + breadcrumbs. Week 5: Polish, tests, packaging, handover demo & short video. What to Include in Your Proposal Relevant portfolio (especially: offline mobile, 3D/GIS/BIM, enterprise dashboards). Tech stack choice and brief architecture sketch. Milestone plan with deliverables tied to budget. Risks/assumptions and how you’ll de-risk timeline. Team size/availability; start date (ASAP preferred).
Project ID: 39737085
Open for bidding
Remote project
Active 56 yrs ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

Ski, Norway
Payment method verified
Member since Feb 8, 2013
$10-30 USD
$1500-3000 USD
$1500-3000 USD
$250-750 USD
$250-750 USD
$25-50 CAD / hour
$250-750 USD
$10-30 USD
₹12500-37500 INR
$30-40 USD
$750-1500 USD
₹37500-75000 INR
$400-500 USD
$250-750 USD
$30-250 CAD
₹1500-12500 INR
$250-750 USD
$5000-10000 USD
₹100-400 INR / hour
₹12500-37500 INR
₹1500-12500 INR
₹12500-37500 INR
$30-250 USD
$750-1500 USD
$1000-5000 CAD