Pekerjaan Tidak Dijumpai

Maaf kami tidak dapat mencari pekerjaan yang anda cari.

Cari pekerjaan paling terkini di sini:

1. We want to develop a REAL-TIME News App for ANDROID and iOS both. [Ref: in-shorts app ] 2. Candidate should know Backend - Node.js 3. Candidate should know Frontend - Flutter 4. Want someone to deliver within time and given budget.

$1054 (Avg Bid)
$1054 Avg Bida
35 bida

Punjab Small Industries and export corporation Ltd is developing a new Industrial Park in Ludhiana which is enlisted as the one of the key project of Punjab Govt. Further, all the basic facilities i.e. internal concrete roads, water supply, sewerage system, effluent collection system, electrical trench and storm water drainage system shall be provided to the allottees. Out of total 380 acre land, ...

$16 (Avg Bid)
$16 Avg Bida
7 bida

Automate Amazon sellers reports

$26 / hr (Avg Bid)
$26 / hr Avg Bida
6 bida

I am looking for a maths teacher who has the gift of explaining complex concepts in simple terms (no bids from india pakistan region please) , and does not make simple concepts into torturous processes. These have to be videos where you are writing on paper and talking and recording with a camera as you write and talk. Will pay per topic. First topic is 'rounding an estimating numbers'....

$10 - $30
$10 - $30
0 bida

want someone help me to get VIRTUAL VISA CARD for online shopping

$250 (Avg Bid)
$250 Avg Bida
1 bida
GIALLOUROS.COM 6 hari left

INDUSTRIAL CONSUMABLES FASTENER B2B PORTAL

$29 / hr (Avg Bid)
$29 / hr Avg Bida
19 bida
internal project 6 hari left

Project is to build UI which only includes rendering graphs (high charts in react) and to build a date picker which includes compare and trend functionality

$147 (Avg Bid)
$147 Avg Bida
20 bida
Graphic design 6 hari left

I am a graphic designer I can do anything you want on this area

$292 (Avg Bid)
$292 Avg Bida
24 bida

I am working on a random forest model on R. I have completed the model and when I plot, the frequency of the r-square values has a negative range to positive two range. I am not sure if I am doing something wrong with my r-square formula. the script was attached. line 195-197 is my r-square formula

$20 (Avg Bid)
$20 Avg Bida
2 bida
$297 Avg Bida
57 bida