
In Progress
Posted
Paid on delivery
I am finalising a commercial project and already have a contractor-prepared BOQ for concrete, rebar, structural steel and a handful of minor items. Before I lock anything in, I need a fresh set of eyes to run an independent material takeoff, compare it against the existing BOQ, and flag any over- or under-quantified elements. There are no company-specific or industry-mandated standards you must follow; just apply recognised best practice and show your workings clearly. Accuracy and transparency are what matter most. Please deliver: • An Excel spreadsheet containing your own measurements, broken down by item and location • A variance column (or separate tab) that highlights differences from the contractor’s figures and brief notes explaining any significant gaps If you use on-screen takeoff tools (Planswift, Bluebeam, Cubit, etc.) mention that in your bid—it helps me understand your workflow, though the final file must still be Excel. Quick turnaround is appreciated, and I’m available to answer scope questions right away.
Project ID: 40707284
9 proposals
Remote project
Active 2 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

I am Having Work Experience in Quantity surveying work and BOQ Preparation.I will provide Accurate Quantity Take off from Drawings for Concrete, Rebar, Structural Steel and Minor work by Excel
₹5,050 INR in 1 day
2.5
2.5
9 freelancers are bidding on average ₹5,122 INR for this job

Hi there, With a strong background in various engineering and architectural fields, including AutoCAD and Building Architecture, performing the task of an independent material takeoff is where I thrive. As evidenced by my 4.9-star rating on 55 projects with a 96% on-time delivery rate, I embrace best practice meticulously to ensure transparency and deliver only accurate reports. Even though the project doesn't specify any particular standards, rest assured that as an agency we have consistently provided high-quality outputs to our clients. Our proficiency extends from crafting custom software solutions to working with SaaS, websites, web apps, APIs and enterprise systems using spreadsheets like Excel which would be crucial for this assignment. Best regards, Mobasher Reza
₹5,050 INR in 3 days
4.0
4.0

Independent verification before locking in a BOQ is the right call — contractor-prepared quantities rarely get a second set of eyes until it's too late to adjust the budget. My approach: remeasure concrete, rebar, and structural steel directly from drawings (Bluebeam for markup and quantification), broken down by item and location, then build a variance tab comparing my figures against the contractor's, with notes flagging any gap over 5% and the likely cause — missed laps, wrong wastage factor, misread details, etc. Final deliverable is a clean Excel file, formulas visible, nothing black-boxed, so you can trace every number back to a drawing reference. Can you share the drawing set and the existing BOQ so I can scope turnaround time accurately?
₹5,999 INR in 7 days
3.2
3.2

Hi, I can perform an independent, rigorous material takeoff for your commercial project to verify the contractor's BOQ before you finalize commitments. Using Bluebeam Revu and PlanSwift for precise digital on-screen takeoffs, I will audit the structural drawings directly to ensure no elements are missed or inflated. Here is what I will deliver in a clean, fully transparent Excel workbook: * **Itemized Takeoff:** Concrete volumes (m³/yd³), rebar tonnage with lap/bend allowances, structural steel weights, and minor items categorized cleanly by gridline, level, and structural element. * **Variance Audit:** A side-by-side comparison tab highlighting differences against the contractor's numbers, complete with clear explanatory notes for any discrepancies. * **Audit Trail:** Transparent formulas and measurement markups so every quantity can be traced directly to the drawings. I can start immediately upon receiving the drawing set. Best regards, MD Asaduzzaman Emon
₹5,000 INR in 7 days
2.2
2.2

Hi I will independently measure the concrete, rebar, structural steel, and minor items, then compare my quantities against the contractor’s BOQ and clearly flag every significant variance. I understand accuracy and transparent workings are the priority, with the final takeoff broken down by item and location and delivered entirely in Excel. What you’ll get: • Independent material takeoff with clear measurement workings • Contractor-vs-independent variance analysis • Notes identifying significant over- or under-quantified items I’m an experienced freelancer and I’ve completed similar projects with 5⭐ feedback for accuracy and delivery. Timeline: 2 days Bid: 5,000 INR Please send me a message so we can get started immediately.
₹5,000 INR in 2 days
0.3
0.3

I DON'T COMPETE ON PRICE. I COMPETE ON RESULTS. I won't waste a second of your time with an AI response, as I'm sure you're already bored of it. So let's talk with facts, actions and implementation. I have extensive experience in conducting independent material takeoffs for commercial projects. This ensures accurate comparisons against existing BOQs and identifies any discrepancies. You need a clean and professional Excel deliverable that highlights variances clearly and transparently. I understand the importance of accuracy in your takeoff and will provide detailed notes on significant gaps. I utilize on-screen takeoff tools like Bluebeam, ensuring efficiency and precision in my measurements. I would love to discuss your upcoming projects with you and answer any questions you may have. Kind Regards, Stacey
₹5,000 INR in 14 days
0.0
0.0

?IF YOU'RE NOT HAPPY, YOU DON'T PAY.? Recently, I assisted a client in validating their commercial project takeoff, ensuring the accuracy they needed before finalizing their contractor's BOQ. I will help you achieve an accurate and transparent validation of your existing BOQ, identifying any discrepancies and providing clarity on your material quantities. I noticed you require an Excel spreadsheet with a breakdown of measurements and a variance column to highlight differences. Accuracy and transparent workings are crucial to your project. I specialize in detailed material takeoffs and have extensive experience outside of Freelancer, but am new to Freelancer. I can utilize on-screen takeoff tools like Planswift or Bluebeam to ensure precision in my measurements. Looking forward to collaborating and ensuring your project is on solid ground. Regards, MORNE.
₹5,000 INR in 14 days
0.0
0.0

⚠️ IF YOU’RE NOT HAPPY, YOU DON’T PAY ⚠️ I have extensive experience in commercial takeoff validation and have worked on similar projects involving detailed material takeoffs. My background ensures I can accurately compare your contractor-prepared BOQ against my own independent measurements, identifying any discrepancies to provide you with peace of mind. I will deliver a comprehensive Excel spreadsheet with clear item breakdowns and a variance column highlighting significant gaps. My approach prioritizes accuracy and transparency, utilizing tools like Planswift to streamline the process while providing you with detailed workings. I’m currently building my reputation on Freelancer, so I’m offering a discounted introductory rate while maintaining the same professional standard I’ve delivered throughout my career. Let's ensure your project is rock solid—I'm excited to get started! Regards, Anchel
₹5,000 INR in 7 days
0.0
0.0

Hello — I can help with this scoped request: Commercial Takeoff Validation. I am finalising a commercial project and already have a contractor-prepared BOQ for concrete, rebar, structural steel and a handful of minor items. Before I lock anything in, I need a fresh set of eyes to run an independent material takeoff, compare it against the existing BOQ, and flag any over- or under-quantified elements. There are no company-specific or industry-mandated standards you must follow; just apply recognised best practice and show your workings clearly. Accuracy and transparency are what matter most. Please deliver: • An Excel spreadsheet containing your own measurements, broken down by item and location • A variance column (or separate tab) that highlights differences from the contractor’s figures and brief notes explaining any significant gaps If you use on-screen takeoff tools (Planswift, Bluebeam, Cubit, etc.) mention that in your bid—it I will confirm the exact inputs and acceptance criteria, complete only the agreed scope, and verify the final artifact against those criteria before delivery. I will identify any missing information rather than inventing it, and I can provide a concise evidence/quality summary with the result. If that approach fits, please share any source files and the required format.
₹5,000 INR in 2 days
0.0
0.0

Chennai, India
Payment method verified
Member since Nov 19, 2014
₹600-1200 INR
₹5000-10000 INR
₹700-5001 INR
₹37500-75000 INR
₹4000-4500 INR
₹1500-12500 INR
$750-1500 USD
₹600-1000 INR
₹5000-5100 INR
₹12500-37500 INR
$15-25 AUD / hour
$15-25 USD / hour
$250-750 USD
$25-50 USD / hour
$250-750 USD
₹12500-37500 INR
₹400-750 INR / hour
₹600-601 INR
$30-250 CAD
$250-750 USD
$250-750 USD
$15-25 USD / hour
₹600-1500 INR
$250-750 CAD
₹12500-37500 INR