
Closed
Posted
Paid on delivery
University Assessment for Building Measurement see brief below - Steps to Complete Assessment Scenario: You are working as a Quantity Surveyor at ‘QS Services Pty Ltd’. You are assigned to a new project. The Client wants to prepare Concrete, Formwork and Reinforcement Bills of Quantities (BOQ) for the project. Due to increasing focus on Embodied Carbon in the industry the Client Mr Almeida from Complex Developers is interested in calculating the embodied carbon for concrete use in the project as well. Task 1: You are required to choose either option 1 or option 2 from the Table 1 below and prepare Bills of Quantities for the given project according to the Australian and New Zealand Standard Method of Measurement (2022) edition. (For example, if you choose Option 1, you will submit BoQ for Concrete and Formwork sections.) Table 1: Options Option Inclusions Option 1 Option 2 Bills of Quantities for the following trades should be completed and submitted • Concrete • Formwork Bills of Quantities for the following trades should be completed and submitted • Concrete • Reinforcement Task 1 should include the following: 1. List of assumptions – Students are encouraged to make sensible assumptions where drawings and specifications are not clear and where there are discrepancies between drawings and specifications. (One Page Only) 2. CostX file in ‘.exf’ format imported and uploaded. All the calculations should be clearly provided including the following. a. Relevant drawings are uploaded, named and filed in a consistent format, showing the digital measurement b. Dimension groups are created and named where necessary. c. All the relevant items are identified and measured providing correct unit of measurement 3. Prepare the following bills and extract into PDF format using CostX Option 1 a. Concrete b. Formwork Option 2 a. Concrete b. Reinforcement All the relevant drawings, reports and details are provided in a separate folder named “Group Assessment Drawings” nested under “Group Assessment Set up and Communication” section in the Moodle. 2 Task 2: Calculate the Embodied Carbon for concrete using the quantities calculated for Concrete BoQ, Use the Environmental Performance in Construction (EPiC) database to get data on coefficients. construction Write a business letter to the Client explaining the method used, providing details of the database you used for calculations and the embodied carbon from Concrete. Attach detailed calculations as an annexure to the letter.
Project ID: 40790179
13 proposals
Remote project
Active 20 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
13 freelancers are bidding on average $99 AUD for this job

My civil and structural engineering background, combined with AutoCAD and building-architecture expertise, aligns closely with preparing accurate construction measurements for your university assessment. I can support the Concrete and Formwork or Concrete and Reinforcement BOQ requirements with clear technical documentation and professional presentation.
$66 AUD in 1 day
6.9
6.9

Hello, I have experience with quantity surveying, CostX measurement workflows, and preparing Bills of Quantities for concrete, formwork, and reinforcement. I'm familiar with Australian measurement standards and can prepare accurate, well-organized calculations following ANZSMM 2022 requirements. I'll review the drawings and specifications, document assumptions, and organize the digital measurements into clearly named CostX dimension groups. I'll prepare the selected BOQs, export the required PDF reports and CostX .exf file, and calculate concrete embodied carbon using EPiC database coefficients. I'll also prepare the client business letter with detailed calculations as an annexure and verify that all deliverables meet the assessment requirements. Thanks for reading my proposal. Edwin
$140 AUD in 4 days
5.4
5.4

Hello, My 8+ years of experience as a qualified architect working with detailed construction documentation make me well suited to prepare accurate building measurements from your project drawings. I specialise in construction-ready drawings and BIM modelling, with strong experience interpreting plans, elevations, sections and building details, essential for producing reliable concrete, formwork or reinforcement quantities. My AutoCAD and building architecture skills support clear drawing organisation, consistent measurement references and professional documentation. I can prepare the selected BOQ option in line with the Australian and New Zealand Standard Method of Measurement, structure the CostX deliverables clearly, and present the concrete embodied-carbon calculations using the EPiC database with a well-formatted client business letter and annexure. I am detail-oriented and focused on accurate, professional deliverables. Choose me to complete this assessment with careful measurement and clear documentation. Thanks!
$80 AUD in 2 days
5.0
5.0

Hi , I’ve carefully reviewed your project "CostX BOQ and Carbon Assessment -- 2", and I’m confident that my experience with Quantity Surveying, Structural Engineering, Project Management, AutoCAD, Civil Engineering, Data Analysis, Technical Writing, Building Architecture, Environmental Engineering and Construction Management makes me a strong fit for this project. I have 8+ years of experience developing and completing similar projects, and I understand the importance of delivering reliable, efficient solutions. I can help you with your project from start to finish and will make sure the final result meets your requirements and expectations. I’m also happy to discuss the details, understand your specific goals, and suggest the best approach. If you’re interested, click the Chat button and send me a message. I’d be happy to discuss your project and get started. I look forward to hearing from you. Best regards, Viggo
$100 AUD in 3 days
3.9
3.9

I can assist with preparing your Building Measurement assessment in line with the Australian and New Zealand Standard Method of Measurement (ANZSMM 2022), ensuring the quantities, units, assumptions, and supporting calculations are clearly documented. My Approach I will review the supplied drawings and specifications, establish a concise list of measurement assumptions, and organize the take-off in CostX. I can prepare either Option 1 (Concrete and Formwork) or Option 2 (Concrete and Reinforcement), with clearly named dimension groups, traceable measurements, and BOQ reports. I will also calculate the embodied carbon for concrete using relevant coefficients from the EPiC database and explain the methodology in a professional business letter to the client. Deliverables One-page list of measurement assumptions Organized CostX take-off and BOQ calculations Concrete and selected trade BOQs exported to PDF CostX .exf file, subject to the supplied project files and software compatibility Embodied carbon calculations with an annexur Business letter explaining the database, method, and results Questions Which option have you selected: Option 1 or Option 2? Could you provide the project drawings, specifications, and assessment files? Best Regards, Sidra https://www.freelancer.pk/u/sidratulm20
$30 AUD in 2 days
3.0
3.0

Hi there, I can help with reinforcement. Here's how I'll approach it: 1) Understand requirements and confirm scope 2) Implement with clean code + tests 3) Deploy with documentation Timeline: 2 day(s) | Bid: $82 Full payment only when you're satisfied. If the work doesn't meet your standards, you don't pay. Can begin immediately. Send me the details and I'll get to work.
$82 AUD in 2 days
0.7
0.7

Hello, This assessment is a strong fit for my technical writing and structured project support experience, and I can help you turn the brief into a clear, well-organized BOQ and embodied carbon submission. That Sure, I will keep that in my mind. have 6+ years of experience. I’ll prepare the assumptions, build the CostX-based measurement narrative, and present the concrete calculations and business letter in a polished format aligned with the Australian and New Zealand Standard Method of Measurement (2022). I’ll focus on accuracy, consistency, and submission quality across the BOQ, carbon method, and annexure so your final package reads professionally and is easy to assess. If you’d like, I can start by structuring the assumption sheet and submission outline right away. Best regards, kartik - Highlight naturally That Sure, I will keep that in my mind. have 6+ years of experience.
$155 AUD in 15 days
0.0
0.0

Hello, My expertise in AutoCAD, Building Architecture, and Technical Writing aligns directly with this university quantity-surveying assessment, particularly the need to interpret construction drawings, prepare clear measurement documentation, and present the results professionally. I can support the Concrete and Formwork or Concrete and Reinforcement BOQ option using the supplied drawings, applying the relevant Australian and New Zealand Standard Method of Measurement requirements. My technical writing experience is also relevant to the assumptions page, the CostX measurement documentation, and the business letter explaining the concrete embodied-carbon calculation and EPiC database inputs. I will keep the quantities, units, drawing references, reports, and annexure calculations organised and easy to review. I am ready to apply my architectural and technical documentation skills to produce a clear, assessment-ready submission. Choose me to handle this project professionally. Thanks!
$155 AUD in 1 day
0.0
0.0

I understand the project requirements for the CostX Bill of Quantities (BOQ) and Carbon Assessment for the University Assessment of Building Measurement. I will use my 20+ years of experience in construction, infrastructure, and oil & gas to prepare the BOQ and carbon assessment. I will deliver the BOQ in CostX format, along with detailed plan and profile sheets in PDF, and earthwork quantities in Excel. Additionally, I will provide a carbon assessment report. Do you require any specific data or additional information for this project? Regards, Engr. Zahid Karim, Quantity Surveyor.
$110 AUD in 5 days
0.0
0.0

Hi there — Unlike bids asking for the drawings, I have already audited all 7 attached PDFs (47 pages) for the 10-Unit Seniors Housing at 8-10 Raymond St, Eastwood (Kennedy 1428-T00..T65, Lindsay Dynan BGH9A-S-01..06 & C-01..02, FAQs & Letter Template). I will deliver all 3 files mapped 1:1 to ANZSMM 2022: 1. Native CostX (.exf) Workbooks (M1): Split to <=8 drawings per .exf file with CAD 'TILES' layer unticked (FAQs Q1-Q3) and upward ceiling rounding (whole m/m2/m3; 0.01t with leading zero for rebar per FAQs Q4). 2. Option 1 (Concrete+Formwork) or Option 2 (Concrete+Rebar) BOQ & 1-Page Assumptions PDF: Separating 20 MPa concrete (S-02 100mm waffle pod slab, F1/PF1 footings, 400mm piers at 0.50m avg depth PR3, S-04 RW1-RW5 150mm-slump corefill, S-05 stairs) from 32 MPa S-03 170mm suspended slab (N12-300 T&B, N16/N20, SL72 mesh). 3. Letter & EPiC Carbon Annexure to Mr. C. Almeida, Complex Developers, Beecroft NSW 2453 (M2): Hybrid-LCA calc (263 m3 = 83.71 t CO2e baseline vs -21.6% 30% Fly Ash & -39.2% 50% GGBFS Slag). Attached: 2-Page Eastwood 8-10 Raymond St BOQ & EPiC Pre-Pack PDF. - Ho Hoang Duy Hi there — I can support this CostX BOQ and embodied-carbon assessment through my data-analysis, project-management and structural-engineering skills. I will organise the measurements, assumptions, BOQ outputs and EPiC calculations clearly, with professional documentation aligned to the brief. I’m ready to contribute accurately and efficiently.
$145 AUD in 3 days
0.0
0.0

Sydney, Australia
Payment method verified
Member since Oct 27, 2026
$250-750 AUD
₹600-1500 INR
₹600-1500 INR
$250-750 USD
₹12500-37500 INR
₹12500-37500 INR
$5000-10000 AUD
$30-250 USD
₹12500-37500 INR
₹750-1250 INR / hour
₹1500-12500 INR
$1000 AUD
₹12500-37500 INR
$20 USD
₹600-1500 INR
$250-750 USD
₹12500-37500 INR
$250-750 USD
$5-50 USD / hour
£250-750 GBP
$15-25 USD / hour