Buka

Project Manager Scheduling Work

14 pekerja bebas membida secara purata ₹2448 untuk pekerjaan ini

kaindo2017

I have worked on more than 1000 papers in report writing,project management, research.I have read and understood your requirement and I know you will never regret, thank you.

₹4500 INR dalam sehari
(122 Ulasan)
6.2
hany74

Hello, I'm a mechanical engineer with project management background, utilizing Primavera P3, P6 and MS Project. I have more than ten years of experience in planning and scheduling projects, follow-ups, and analysis i Lagi

₹7777 INR dalam sehari
(44 Ulasan)
5.1
nykunal

Hello, Hope you doing great! I am new here and an expert in scheduling with quality of work. Please review my profile for more information. Looking forward to hearing back from you soon. Regards, Ku Lagi

₹5000 INR dalam sehari
(3 Ulasan)
2.5
kyeremehjr11

I am good in ms office and ready to help you do your work so you can review and call me so that I can start worj

₹1300 INR dalam sehari
(0 Ulasan)
0.0
₹5000 INR dalam sehari
(0 Ulasan)
0.0
₹1250 INR dalam sehari
(0 Ulasan)
0.0
spa57c3c1b2ae971

Worked in management roles for 18 years. Clientele: Nestle, IBM, Unilever, UBS, Samsung, British Petroleum, KPMG, Deutsche Boerse, Johnson & Johnson, Philip Morris International, Electronic Arts and Mindtree. Worked Lagi

₹1300 INR dalam sehari
(0 Ulasan)
0.0
ahmedmohatef

Hello Sir, I am planning and cost control engineer graduated in 2012, i specialized in civil engineering department project management sector, i have 6 years experience in planning and cost control. I can do the Lagi

₹600 INR dalam sehari
(0 Ulasan)
0.0
Bakersalehpmp

I am Planner and a PMP certified Engineer. I will make your project schedule as per requirements and desires on time. I will work on Primavera P6 for project management planning and scheduling.

₹1150 INR dalam sehari
(0 Ulasan)
0.0
₹1000 INR dalam 4 hari
(0 Ulasan)
0.0
angelforceice

-Generar Línea base de los Proyectos. -Distribución de recursos por etapas/niveles o Departamentos - Puntos de control de avance - Indicadores de Gestión

₹1300 INR dalam 3 hari
(0 Ulasan)
0.0
₹1300 INR dalam sehari
(0 Ulasan)
0.0
jeefoBK

Hello! I propose to you a phased implementation of this task: 1. Developing a schedule in Primavera P6 2. Assigning resources to work in line with the estimate of the project 3. Unloading of assigned resources (mat Lagi

₹1500 INR dalam sehari
(0 Ulasan)
0.0
₹1300 INR dalam sehari
(0 Ulasan)
0.0