Dibatalkan

Revit MEP 2015 Tagging

Tagging devices on floor plans there are ~90 plans each with an average of forty devices per plan(conduits and equipment). Please do not cross leader lines. Have a few of these to doso could be more work incoming if it works well. The tags family and the devices have all required information all that is required is to place the tags and clean up the tag locations. I'd imagine it'd take 8 hours roughly.I I've included a sample sketch for reference. Each conduit should only be tagged once in between boxes even though there may be multiple segments.

Kemahiran: Pemodelan 3D, AutoCAD, Autodesk Revit, Kejuruteraan Bangunan, CAD/CAM

Lihat lagi: revit mep bangalore, revit mep sanitary, revit mep standards, revit mep pump sizing, revit mep consultant, revit mep documents, revit mep india, hot water pipe revit mep, revit mep standard details, revit mep sample drawings, revit mep load calculations orientation, revit mep load calculation, pressure calculations revit mep pipe sizing, hap carrier revit mep, outsourcing revit mep

Tentang Majikan:
( 1 ulasan ) Pickering, Canada

ID Projek: #17139453

3 pekerja bebas membida secara purata $18/jam untuk pekerjaan ini

amilmef

Hello. I am Amil, Msc Mechanical engineer. I have six years experience with preparing engineering (tech docs) drawings. Also I am certified AutoCAD ( with ad) engineer. Message me and we will discuss more in chat. Lagi

$15 CAD / jam
(24 Ulasan)
5.9
$15 CAD / jam
(47 Ulasan)
5.3
HoneyApplePie

Hi Dear I am expert in Designing 2d and 3d models and its animations in Maya/Blender and other softwares. I can create Model, Texture it and can do its rigging as well. Here are some solo projects which I would love Lagi

$25 CAD / jam
(0 Ulasan)
0.0