
Ditutup
Disiarkan
Dibayar semasa penghantaran
PSM Welding is a specialist welding and mechanical contractor operating across water, recycled water, fuel lines, and civil infrastructure projects throughout NSW. We currently have an existing SWMS document. However, we require a complete consolidation and professional rebuild that: Incorporates all content from our original SWMS Integrates additional high-risk activities discussed in recent project requirements Aligns with NSW WHS legislation and current industry expectations Is structured, professional, and client-ready This document must be suitable for submission to Tier 1 and Tier 2 principal contractors (e.g. water and infrastructure projects). Scope of Work The freelancer will: Review our existing SWMS document (to be supplied). Rebuild and restructure it into a comprehensive, modern format. Incorporate additional high-risk construction work (HRCW) requirements previously identified. Ensure compliance with NSW WHS Regulation requirements. Deliver in editable Word format. Activities to be Covered (Minimum) The SWMS must cover, but not be limited to: Core Activities MSCL Welding Butt welding Mechanical fit-out Pipe installation & tie-ins Cutting and grinding Use of welding plant and generators Lifting operations Use of mobile plant Work inside trench excavation Working around live services (water/fuel) High-Risk Construction Work (HRCW) to be Incorporated Must include detailed controls for: Work in or near trench deeper than 1.5m Work in confined spaces (including shaft welding) Work at heights (including davit / harness entry systems) Work near traffic corridors (TMP/VMP references) Work in areas of extreme temperatures Hot works Working near underground services Crane lifts and dogging/rigging Confined space sections must reference: Entry permit system Rescue & retrieval plan Gas monitoring Air extraction Standby person requirements Specific Requirements from Previous Project Discussions The updated SWMS must incorporate: Confined space welding treated as shaft entry Rescue plan inclusion No shock absorbing lanyards (where previously specified) Edge protection requirements Client-issued confined space permit compliance Traffic management plan referencing (TMP, VMP, TGS) 8-hour minimum shift assumptions Standby time considerations Plant risk controls (generator, compressor, welding plant) Subcontractor control requirements QA documentation responsibilities for welding Welding failure / rectification responsibility wording aligned with PSM policy Risk & Control Format The SWMS must include: Activity step Hazard identification Initial risk rating Control measures (hierarchy of control applied) Residual risk rating Responsible person Clear, structured tables — not paragraphs. Mandatory Inclusions PPE matrix (all standard PPE except shock absorbing lanyard) Emergency procedures First aid requirements Environmental controls (noise, fumes, waste) Hot works controls Plant pre-start requirements Tool inspections Manual handling controls Induction and competency verification Sign-on register section Review and monitoring section Legislative Framework Must align with: NSW WHS Act & Regulations WHS Regulation 291 (High Risk Construction Work) Confined Space Regulations Relevant SafeWork NSW Codes of Practice Formatting Requirements Microsoft Word (.docx) Professional layout Company header section Authorised Representative: Philip McCaghey – Director Suitable for client submission Editable tables Clean and modern format
ID Projek: 40221172
24 cadangan
Projek jarak jauh
Aktif 1 bulan yang lalu
Tetapkan bajet dan garis masa anda
Dapatkan bayaran untuk kerja anda
Tuliskan cadangan anda
Ianya percuma untuk mendaftar dan membida pekerjaan
24 pekerja bebas membida secara purata $106 AUD untuk pekerjaan ini

Hey, I am an engineer and understand the paramount importance of detailed and accurate Safety and Health documents within a high-risk construction environment. I believe my unique combination of technical, writing, and strategic skills makes me the perfect fit for your project. With over 15 years of professional writing experience, I am well-versed in generating comprehensive content, aligned with regulatory requirements, that is client-ready and easily understandable to all stakeholders. To deliver this revamped SWMS document for PSM Welding, my approach follows a four-stage strategy tailored to produce contents that work specifically to your goals: conducting extensive research, creating clear plans intuitively tailored for an audience, executing tactically-crafted authoritative content and ensuring meticulous refinement and editing. My commitment goes beyond just providing you with an excellent SWMS document; rather, I provide a valuable partner committed to delivering content that reduces risk, conserves time & money and keeps you compliant with safety_as_a_re_incidence guidelines. So let's break down complex_critical tasks into simple steps that anyone can follow using modern tables – not paragraphs format and, create a document that is not just functional but facilitates effective communication of safety measures across every important stakeholder.
$200 AUD dalam 2 hari
7.4
7.4

Hello PSM Welding Team, As a leading American Licensed Engineering firm experienced in structural and civil engineering, I am well-equipped to rebuild and enhance your SWMS document. Leveraging over 20 years of expertise across 50+ states and Canadian provinces, we ensure compliance with NSW WHS legislation and industry standards. We will meticulously review your SWMS, integrate high-risk activities, and deliver a comprehensive, client-ready document. Our approach guarantees alignment with Tier 1 and Tier 2 contractor expectations, emphasizing modernization and regulatory compliance. Let's proceed with a detailed review to customize and enhance your SWMS for seamless submission to principal contractors. Cheers, RedBrick American Engineering
$30 AUD dalam 3 hari
6.4
6.4

My name is "Usama Safdar" and I am a Ph.D degree holder which means I am highly-capable to tackle this project "Content Editor " with 100 percent accuracy. I am a professional writer with over 6 years of experience in writing; Essays, Research Summaries, Thesis, Dissertation, Lab Reports and Case Studies. I always provide High-Quality Solutions within the shortest possible time with all instructions followed against very reasonable prices. I can manage works even with shortest deadlines like; "2500 words work in just 6 Hours" with very reasonable time. As a pro academic writer I am also familiar with all the referencing styles; such as APA, Harvard, OSCOLA, IEE, MLA etc. I always provide plagiarism-free solutions and as a prove I also provide "FREE Turnitin reports". For Samples, please visit my profile https://www.freelancer.com/u/SolutionMart Please message me to start the discussion. Thank You
$30 AUD dalam 1 hari
5.9
5.9

Rebuild SWMS Document for PSM Welding I’m a professional writer with extensive experience crafting engaging, precise, and high-quality content across academic, professional, and creative fields. I specialize in delivering work that not only meets requirements but also resonates with the target audience. Every project I take on is handled with care, attention to detail, and originality. I ensure timely delivery while maintaining clarity, structure, and style tailored to your needs. I’d love the opportunity to bring your ideas to life and exceed your expectations. Best regards, GameOfWords!
$30 AUD dalam 1 hari
5.0
5.0

Drawing on my extensive skills as a civil and mechanical engineer, I have hands-on ability in 3D animation that will serve me well in completely rebuilding your SWMS documents. With my team's proficiency in architectural design and interior planning, we can guarantee not only compliance with the NSW WHS regulations but also documents that will set you apart when you submit them to Tier 1 and Tier 2 principal contractors. During our career, we have worked extensively with welding outfits within the infrastructure sector and this familiarizes us with all the necessary requirements that go into an effective SWMS document for your type of work. We'll seamlessly incorporate detailed controls for high-risk activities like work near traffic corridors, in confined spaces (including shaft welding), at heights including management plans for TMP/VMP reference.
$35 AUD dalam 14 hari
4.9
4.9

Hello, I understand that PSM Welding requires a complete consolidation and professional rebuild of your existing SWMS to meet NSW WHS legislation and Tier 1 / Tier 2 contractor standards. I will review your current document, incorporate all additional High-Risk Construction Work requirements, and restructure everything into a clear, table-based, client-ready format aligned with WHS Regulation 291 and SafeWork NSW Codes of Practice. The updated SWMS will include detailed activity steps, hazard identification, risk ratings, hierarchy-based control measures, confined space (shaft welding) procedures, rescue planning, traffic management references, plant risk controls, QA responsibilities, PPE matrix, emergency procedures, and sign-on sections. Deliverable: • Fully editable, professionally formatted Microsoft Word (.docx) document • Structured tables (no long paragraphs) • Company header with Authorised Representative: Philip McCaghey – Director • Suitable for submission to Tier 1 and Tier 2 contractors Portfolio: [https://www.freelancer.in/u/CreativeDesign50](https://www.freelancer.in/u/CreativeDesign50) Looking forward to preparing a compliant and submission-ready SWMS for PSM Welding. Best regards, Kirandeep Kaur
$61 AUD dalam 1 hari
4.1
4.1

Hello, I can skillfully consolidate and modernize your SWMS document for PSM Welding, aligning it with NSW WHS legislation and industry standards. My expertise in civil engineering and project management ensures a professional, client-ready document. Let’s discuss how we can integrate the high-risk activities required. What specific additional high-risk activities do you want to prioritize in the updated SWMS? Thanks, THE CALIFORNIA STUDIO
$56 AUD dalam 2 hari
3.7
3.7

Hi, I have carefully reviewed the project description and I am confident in my ability to rebuild and enhance the SWMS document for PSM Welding. With my 3+ years of experience in Civil Engineering, I am well-equipped to consolidate and professionally restructure the existing SWMS document to align with NSW WHS legislation and current industry expectations. My approach involves a detailed review of the current document, incorporating additional high-risk activities, and ensuring compliance with relevant regulations. The final deliverable will be a structured, client-ready document suitable for submission to Tier 1 and Tier 2 principal contractors. Lets Discuss on chat further details I am excited about the opportunity to work on this project and would love to discuss it further. Please feel free to reach out with any questions or to refine the details together. Best Regards, Salman Khan
$50 AUD dalam 1 hari
3.7
3.7

Hello, With over 7 years of experience in Technical Writing, I have carefully reviewed your project requirements. To rebuild the SWMS Document for PSM Welding, I will thoroughly review your existing document and incorporate all content while integrating additional high-risk activities as per recent project requirements. I will ensure alignment with NSW WHS legislation and industry standards, delivering a structured, professional, and client-ready document suitable for submission to Tier 1 and Tier 2 principal contractors. My approach involves rebuilding and restructuring the document in a comprehensive, modern format, incorporating detailed controls for high-risk construction work, and addressing specific requirements from previous project discussions. The SWMS will follow a clear risk and control format, including mandatory inclusions and compliance with relevant legislative frameworks. I would appreciate the opportunity to discuss this project further in detail. Please connect with me in the chat for a more in-depth conversation. You can visit my Profile at https://www.freelancer.com/u/HiraMahmood4072 Thank you.
$100 AUD dalam 2 hari
4.0
4.0

Hi, there. I’m a WHS documentation specialist experienced in rebuilding SWMS for Tier 1 & 2 infrastructure projects across Australia. I can consolidate your existing SWMS into a structured, client-ready document aligned with NSW WHS Act, WHS Reg 291, confined space regs, and SafeWork NSW Codes. I’ll integrate all HRCW, confined space shaft-entry controls, rescue plans, TMP/VMP references, PPE matrix (excluding shock lanyards), plant controls, QA and subcontractor responsibilities—formatted in clear risk tables. Delivered in professional, editable Word (.docx) format, ready for submission.
$100 AUD dalam 3 hari
3.3
3.3

Hello, I am excited to assist PSM Welding in reconstructing your SWMS document to align with the stringent NSW WHS regulations and elevate your project's compliance standards. My extensive experience in compliance documentation, particularly within the construction sector, has equipped me with the necessary skills to deliver a meticulously structured and professional SWMS that meets Tier 1 and Tier 2 contractor expectations. I will carefully review your existing SWMS, incorporate high-risk construction elements, and ensure all content is presented in clear, editable tables for ease of use. My approach will include a comprehensive risk assessment that highlights controls and compliance measures while adhering to current industry standards. I am confident in delivering this project within 7 days, ensuring it is client-ready for submission. What is the timeline for your upcoming projects to ensure the SWMS aligns perfectly with them?
$70 AUD dalam 2 hari
2.5
2.5

Hi there, I am excited to assist PSM Welding in rebuilding your SWMS document to meet the high standards required by Tier 1 and Tier 2 principal contractors. With extensive experience in technical writing and compliance within the welding and civil engineering sectors, I will ensure that the new document not only integrates all content from your existing SWMS but also includes the high-risk activities you mentioned aligned with the latest NSW WHS legislation. My approach will focus on creating a structured, client-ready document with clear tables for each activity, hazard identification, and comprehensive controls. I will deliver the final SWMS in an editable Word format, ensuring it meets all formatting requirements for your submissions. I look forward to discussing specific timelines to ensure we can meet your project needs effectively. What specific deadlines do you have in mind for this project? Best regards, Muskan
$70 AUD dalam 2 hari
3.0
3.0

Hello there , Good afternoon! I am a talented developer with skills including Technical Writing, Civil Engineering, Construction, Mechanical Engineering, Risk Management, Project Management, Welding and Compliance. I am checking your attachment, I'll update you shortly... I am confident in my ability to deliver high-quality results on your project and look forward to providing examples of similar work upon request. plz check my profile::::https://www.freelancer.com/u/davidb179 Please send a message to discuss more about this project. Thanks for giving opportunity
$155 AUD dalam 2 hari
0.0
0.0

As a FULL STACK SOTWARE ENGINER with over 12 years of experience, I possess intrinsic knowledge about the unique intricacies involved in comprehensive project management. My expertise spans across popular platforms like WordPress, Woocommerce, Shopify, and more. This makes me particularly well-suited to handle your SWMS document restructuring project for PSM Welding. Being proficient in PHP and LaraveI,I shall ensure your SWMS is not only meets the requirements but also is tailored perfectly to comply with the NSW WHS regulatory framework. Furthermore, considering my ability to design user-friendly and clear layouts that incorporate detailed and structured tables, I assure you of a modern, client-ready document. As mentioned in my profile description, I am passionate about building and scaling technology products while hiding the complexity behind an easy software interface. We can benefit from this axiom in your SWMS reconstruction project to present a technically accurate yet intelligible document to your Tier 1 and Tier 2 clients. Incorporating additional high-risk activities armaximizeding your existing SWMS will be managed meticulously as per our collaboration through transparent interactive communication while respecting deadlines. Restoring edge protection requirements,respecting client-issued confined space permit compliance, incorporating traffic management plan referencing, taking into account multiple shift assumptions would be handled earnestly.
$120 AUD dalam 10 hari
0.0
0.0

Hello Philip, could you please share the existing SWMS document for review? My extensive compliance expertise ensures your SWMS meets NSW WHS laws and industry standards. Best regards, Gert Smit (Travis)
$200 AUD dalam 14 hari
0.0
0.0

“I can review your existing SWMS document, restructure and consolidate it into a clear, professional, and client-ready format, ensuring readability and proper organization. I will follow the NSW WHS guidelines as references and integrate any additional activities provided.” .
$30 AUD dalam 1 hari
0.0
0.0

Sydney, Australia
Kaedah pembayaran disahkan
Ahli sejak Feb 11, 2026
$30-250 AUD
$250-750 AUD
£10-15 GBP / jam
₹750-1250 INR / jam
$30-250 USD
$250-750 USD
$250-750 USD
min $100000 USD
$1500-2000 CAD
€50000-100000 EUR
$8-15 USD / jam
$15-25 USD / jam
₹1500-12500 INR
£250-750 GBP
₹1500-12500 INR
min $50 USD / jam
₹600-1500 INR
$5000-10000 USD
₹600-1500 INR
min $50 USD / jam
$250-750 USD
$250-750 AUD