Imej profil bukit
@bukit
Penanda Indonesia Jakarta Timur, Indonesia
Ahli semenjak 20 Mac 2012
0 Cadangan

bukit

Dalam Talian Luar Talian
Work as project coordinator in Telecommunication Company and familiar with MS Office : PDF, MS Word, MS Excel, MS Power Point and other software telecommunication software such as TEMS Investigation, Actix, MapInfo and other support software to process data logfile.
0 ulasan
0.0
  • N/AKerja Diselesai
  • N/AMengikut Bajet
  • N/ATepat Pada Masa
  • N/AKadar Ulang Upah

Portfolio Items

Ulasan Terkini

Tiada ulasan.

Pengalaman

Project manager

Aug 2012

Project Manager - Grentech Indonesia August 2012 - Present • Kickoff meeting with project team and the customer of the project to commit Project Scope, Project Schedule and Quality. Introduces the members, discussed the rule of activity, document and status reporting. • Read AUTOCAD Design, calculation link budget and implementation project based on Plan and Scheduling for all activity to meet KPI based on Master Agreement using MS Excel, MS Power Point and MS Project. • Manage and coordination about material delivery, installation and measurement procedure, commissioning, ON AIR and Acceptance Test on different team and location to produces Report as customer requirement. • Supervise and manage Sub-Contractor activity on different team and location. Create and maintain actions, issues and risks registers to produces daily progress report and update information. • Interfacing with customer for presentation regarding the activity and progress. Produces and maintain a contact list for the project and keep relationship during the project. • Coordinate with Sub-Contractor for all Final Report such as Material Usage Report, Measurement Report, Photo Report and all documentation for Acceptance Test Report. • Liaison with Sub-Contractor related activities such as document SOW, PO and Invoicing/Payment.

Coordinator of NPI Project & VIP Complaint Telkomsel Ind.

Mar 2010 - Aug 2012 (2 years)

• Interfacing with customer for presentation regarding the activity and progress. • Daily progress report, update information and final report. • Follow up if any VIP and VVIP complaint include Drive/Walk Test measurement, verification of complaint include the performing cell (Voice and Data Testing). • Routes planning for Drive Test in Jabodetabek Cities. Drive/Walk Test in the most important area such as highways, Airports, Railway stations, squares and other hot spot using TEMS 8.03 and NEMO handy. • Drive/Walk Test data post processing, capture and report analysis with TEMS 8.03 and 10.03 (export, Report Generator, Event and Layer 3 Message) Log File, Map Info and Actix.

Maintenance & Project Coordinator

Mar 2005 - Dec 2009 (4 years)

• Manages Operation & Maintenance Activity (Schedule and budget planning) to keep KPI as customer requirement. • Maintain all site and daily monitoring with NMS (Network Monitoring System)and verify the status of KPI every month to customer. • To provide check list for maintenance activity, conduct quality audit of maintenance and measure the compliances with all standard/specs/requirements. • Manage project (Survey, Design and Implementation) planning, scheduling, tools and resources, estimated budget, monitoring and updating activity using MS Excel, MS Power Point and MS Project. • Manage project team (5 Engineers and 15 technician) activity on the different location for Telkom Flexy project all around Indonesia. • Perform and control implementation including integration management project such as Civil, Mechanical and Electrical accordance with time plan and quality. • Manage project team (6 Engineers and 20 technician) activity on the different location for Indosat and Axis project. • Liaison between internal management and external customer, technician staff, sub-contractor and communicated extensively with customers, sub-contractors and vendor to establish effective working relationship. • Keep the management informed of progress report, Preparation, Review and Documentation of project report until close.

Sr. Supervisor

Feb 1999 - Feb 2005 (6 years)

• Project Leader of four Six Sigma project and Black belt Holder for implementation activity. • Leader of Customer Satisfy Unit Internal and after-sale service to customers (External). • Supervise and manage directly 92 team members and system process, analyze and control quality input. • Manage and documentation daily check sheet to control machine and operator performance. • Trainer for team member, study process, prepare Work Instruction (W/I), Work Standard (W/S) and Standard Quality

Pendidikan

• Bachelor’s degree in Electrical Engineering

1991 - 1997 (6 years)

• Cisco Networking Academy Program (CNAP) Certificate

2001 - 2002 (1 year)

Kelayakkan

Network Planning & Optimization (2009)

ZTE Certified CDMA RF Optimization

Network Planning & Optimization how to design and implementation network using cisco router, switch

Project Management certificate (2007)

PPM Institute of Management

- Project Management how to manage time and schedule and cost. - Make time schedule with MS project

ISO 9001 Version 2000 Certificate (2002)

TUV Rheinland Indonesia

ISO 9001 Version 2000 Certificate how to control quality product

Pengesahan

  • Facebook Disambung
  • Freelancer Keutamaan
  • Bayaran Disahkan
  • Telefon Disahkan
  • Identiti Disahkan
  • E-mel Disahkan

Cari Freelancer yang serupa