Imej profil coleffect
@coleffect
Ahli semenjak 22 Februari 2010
1 Cadangan

coleffect

Dalam Talian Luar Talian
I want to be a successful freelancer and a good Freelancer provider. I have clear concept in information technology, servers/network, telecommunication and familiar with planning, requirement analysis, technical documentation, installation, support. I gather technical knowledge from my academic courses, profession, technical trainings, workshops, seminars and want to upgrade my level, just need a chance to use my skills. In future I will try to cover all engineering materials. My Freelancer profile "http://www.freelancer.com/u/coleffect.html" is fully updated please have a look, if you find pe rfect quality from my profile, please infor m me. I will give my full 100% afford. You will get a world class professional attitude from me with respect to every works. You can always contact me at any time. Thanks for giving me your time and consideration. I am willing to hear from you always and want to build a long term business relationship with you. Have a Good Day. Engr. Javed
$1 USD/hr
1 ulasan
0.0
  • N/AKerja Diselesai
  • N/AMengikut Bajet
  • N/ATepat Pada Masa
  • N/AKadar Ulang Upah

Portfolio

Ulasan Terkini

Tiada ulasan.

Pengalaman

Freelancer

Jun 2012

Working as a freelancer from June, 2012 and currently I involve in a forum posting task. Recently I have done the hardware installation of HP Rack mounted server project of Philips, Dhaka. I have done a web content uploading project, create some blogs, wordpress and familiar with writing, web research, link Building, data entry, etc.

Manager - IT

Dec 2011 - Jun 2012 (6 months)

o Involved in the installation/maintenance of Servers/Clients, Computers, Intranet/Internet, Voice Communication, Data Connectivity, CCTV, POS Counters, Electrical Connection. o Engage in the Mohakhali CSD Super Shop - Dhaka, Bogra Exclusive Shop, CSD Junction Super Shop - Dhaka, Baridhara CSD Super Shop - Dhaka, Savar Exclusive Shop projects and successfully install and commission the require IT equipment's, Server/Clients setup, Network deployment both intranet and internet as per following managem

Engineer

Oct 2010 - Sep 2011 (11 months)

o Start my career in an Engineering firm as an Electrical Engineer. o Involved in the erection and installation of mechanical equipments, pipe laying and civil construction works at Muchai Gas Compressor Project, Chevron Bangladesh ltd, Srimangal, Sylhet. o Responsible to analysis the technical drawings, project planning, schedule discussing with co-workers. o Responsible to manage a team of 10 members (minimum) including qualified welders, fitters, grinders, operators, helpers, welding generator, gas cu

MIS Intern

Mar 2010 - Aug 2010 (5 months)

o Assigned in the MIS department to give IT support for official test software and web development. o Need to troubleshoot internel computers, laptops and engage in the networking activities.

Markating Communication Manager

Dec 2009 - Feb 2010 (2 months)

o After completing Post Graduate - Diploma (PGD) in Computer Information Technology (CIT), I had finished IT fundamental training in php, mysql for one month (December, 2010) and joined the software firm in January, 2010 and stayed to February, 2010. o My responsibility is to take very basic level web programming classes.

Call Centre Trainee

May 2008 - Nov 2008 (6 months)

o Initialize each and every session with greetings and understand the need and objective by inspection, searching questions. o Maintain the atmosphere by showing positive, polite, familiar attitude and try to overcome within a limited period. o Clear and fluent conversation and exchange information without hamper the situation. o Maintain courtesy in the whole session and close the session showing gratefulness. o Fulfill requirements of the customer as per following management policies.

Pendidikan

B.Sc in Engineering

2004 - 2008 (4 years)

Post-Graduate Diploma in Computer Information Technology (PGD in CIT)

2008 - 2009 (1 year)

Higher School Certificate (HSC)

2001 - 2003 (2 years)

Secondary School Certificate (SSC)

1991 - 2001 (10 years)

Kelayakkan

IEB Certified LAN & WAN Administrating with Windows 2003 Server (2012)

Engineering Staff College, Bangladesh (ESCB), IEB

Cisco Certified Network Associate (CCNA) (2007)

AIUB Cisco Networking Academy

CNC Machineries (2010)

Institute of Appropriate Technology (IAT), BUET

CNC Machineries, G-Code technology, Industrial Concept

Heat Treatment (2010)

Institute of Appropriate Technology (IAT), BUET

Metal structure, various types of heat treatments, Machineries, Management, Safety Engineering, Technical Laws.

Microcontroller (2010)

Engineering Staff College Bangladesh (ESCB), IEB

Basic concept of Microprocessor and Microcontroller, Hardware Connection with Software Setup, ADC, Interrupt, Timer, RTC, USART, 7 Segment and LCD Display.

Programming of PLC System (2008)

Engineering Staff College Bangladesh (ESCB), IEB

Industrial Automation, Maintenance and Troubleshooting, Concept of PLC System, Ladder diagram, Installation of LOGO PLC.

3D Animation & Visual F/X (2009)

Aura Animation

Graphics, Flash, Annimation, Visual Effects, 3d MAX, MAYA.

Digital Photography (2009)

Institute of Language & Creative Sation (ILCS)

Photography, Camera Movements, Different Shoot Position, Procedure, Tools.

Few Moments in Space Science (2010)

National Museum of Science & Technology (NMST)

Space Science, Black Hole, Quantum Physics, Motion.

21st History of Art & Art Appreciation Course (2009)

Bangladesh Shilpokola Academy (BSA)

History, Art, Paintings, Classical Paintings, Colors, Findings.

Tobacco Economics (2010)

Unnayan Shamannay

Penerbitan

Design and Implementation of Liquid Level Controller, Display and Measurement

With the wide use of advanced electrical technology developed during past decades it is challenging to simplify the design and efficiently develop any kind of electrical circuit and use them in the real world whenever needed. Although there are lots of integrated circuits are available for our daily use, it is the main concern for the designer or developers to reduce the number of Integrated Circuits to minimize the complexity and the cost.

Pengesahan

  • Facebook Disambung
  • Freelancer Keutamaan
  • Bayaran Disahkan
  • Telefon Disahkan
  • Identiti Disahkan
  • E-mel Disahkan

Cari Freelancer yang serupa