Modelling simulation using tecnomatix plant simulation 15

Ditutup Disiarkan 2 tahun lepas Dibayar semasa penghantaran
Ditutup Dibayar semasa penghantaran

Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.

Manufacturing Engineering

ID Projek: #30620675

Tentang projek

1 cadangan Projek jarak jauh Aktif 2 tahun lepas

1 pekerja bebas membida secara purata $200 untuk pekerjaan ini

wtomazini13

Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks

$200 USD dalam 10 hari
(0 Ulasan)
0.0